SOLARIG™ TUNNEL KIT
Installation Manual for Model Alpine-135
- 19 -
Figure 13: Position of anchors for first arc
•
Add C-profiles at 1/3 height and HOR3784314 pipes at the peak.
•
Add pipes between arcs 1 to 2 and arcs 5 to 4, at 2/3 height on both sides.
Figure 14: Connecting first arc to second arc