WT-120 Goniometer 15
www.pimicos.com // [email protected] // phone:+49(0)7634-50 57 0 // fax:+49(0)7634-50 57 393
Mounting the Additional Part
• Select the mounting position so that the existing fixing holes in the slider
of the WT-120 can be used for the additional part to be mounted.
• Affix the additional part with the corresponding screws.
5.4
Mounting with WT-90
6.
START-UP
6.1
General Notes on Start-Up
This goniometer must be started up with a suitable cable and the associated
controllers.
7.
MAINTENANCE
Depending on the operating conditions and the period of use of the WT-120,
the following maintenance measures are required:
Maintenance Run
The maintenance run is performed to redistribute the existing lubricant on
the guidings of the stage.
• To evenly distribute the existing lubricant on the stage guides, perform a
maintenance run across the entire travel range after 500 hours of
operation, or after 1 year at the latest.
• If the stage is to be operated continuously in an industrial environment
over a small travel (less than 20 percent of the entire travel range),
perform a maintenance run across the entire travel range every 5000
motion cycles.
Lubrication
Under laboratory conditions, the guidings of the stage need to be lubricated
in exceptional cases only. For continuous industrial use, the lubrication
intervals must be defined individually.
• Do not lubricate the guidings of the WT-120 without consulting our
customer service department (see chapter 9).
• To lubricate the guidings, follow the instructions specified in the
maintenance manual, which you can obtain from our customer service
department.