Quick
Start
Guide
L-79
1e_5
Germany
PHYTEC Messtechnik GmbH
D-55129 Mainz
t +49 6131 9221-32
f +49 6131 9221-33
www.phytec.de
www.phytec.eu
USA
PHYTEC America LLC
Bainbridge Island, WA 98110
t +1 206 780 9047
f +1 206 780 9135
www.phytec.com
France
PHYTEC France SARL
F-72140 Sillé le Guillaume
t +33 2 43 29 22 33
f +33 2 43 29 22 34
www.phytec.fr
India
PHYTEC Embedded Pvt. Ltd.
Koramangala
Bangalore 560095
t +91 80 408670-46/49
www.phytec.in
China
PHYTEC Information Technology Co. Ltd.
Nanshan District, Shenzhen
518026 PRC
t +86 755 6180 2110
www.phytec.cn
phyBOARD
®
-
Wega AM335x
Get your phyBOARD
®
-Wega powered up and connected in just a few simple steps.
1) Preparing the Hardware
1.
Have your connection cables at hand: You need an RS-232 cable (one-to-one) and a standard
Ethernet cable. Phytec offers an accessory kit which includes these cables.
2.
Power up the phyBOARD-Wega.
For the 24 V-kit version (A):
Connect the 2-pin PHOENIX
connector (included) to a 12 V-24 V (±10 %) DC power supply.
For the 5 V-kit version (B):
Connect the 2-pin PHOENIX connector (included) to a 5 V (±5 %)
DC power supply. In both cases please note the polarity of the connectors (see picture A/B)!
If you have bought the optional power supply with your kit, it comes already with the 2-pin connector wired.
3.
Turn your power supply on and plug the 2-pin PHOENIX connector into the green jack of your kit.
The Power LED
D58
will light up.
Please note: only the 24 V-kit version
comes with the power adapter board.
Kit
Contents
Optional
Accessories
phyBOARD-Wega AM335x
2-pin
Evaluation Module Power Module 12 V-24 V
PHOENIX
(PEB-EVAL-01)
(PEB-POW-01)
RS-232 and
USB Flash drive with HDMI Adapter
CAN Adapter
Virtual Machine
(PEB-AV-01)
Required Additional Equipment
Power Adapter 5 V or 24 V RS-232 Cable Ethernet Cable
12 V-24 V-kit version
A
5 V-kit version
+
GND
B
+
GND