![Phuel BOP System Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/phuel/bop-system/bop-system_user-manual_1553776002.webp)
User Manual
Modular BOP System (Dual)
OPS-3653-Rev A
i
Table of Contents
Revision History .......................................................................................... iii
Safety .............................................................................................................. iv
1
Introduction ............................................................................................... 1
1.1
General .............................................................................................. 1
1.2
Product Identification ......................................................................... 1
2
Technical Specification ............................................................................. 3
3
Technical Description ............................................................................... 5
3.1
Basic Description ............................................................................... 5
4
Operation .................................................................................................. 6
4.1
Operating the Rams........................................................................... 6
4.1.1
Hydraulic Operation .................................................................... 6
4.1.2
Manual Operation ....................................................................... 6
4.1.3
Locking the Rams ....................................................................... 6
4.2
Equalising across the rams ................................................................ 7
4.3
Job Planning ...................................................................................... 8
4.3.1
Before the Job ............................................................................ 8
4.3.2
During the Job ............................................................................ 8
4.3.3
After the Job ............................................................................... 8
5
Maintenance ............................................................................................. 9
5.1
Introduction ........................................................................................ 9
5.2
Schedule ............................................................................................ 9
5.2.1
Pre & Post Job............................................................................ 9
5.2.2
Yearly ......................................................................................... 9
5.2.3
Five Yearly ................................................................................. 9
5.3
Safety ................................................................................................ 9
5.4
Tools ................................................................................................ 10
5.5
Ram Seal Redress........................................................................... 10
5.5.1
Access Rams............................................................................ 10
5.5.2
Ram Removal (not required to redress ram seals) ................... 11
5.5.3
Ram Seal Redress ................................................................... 11
5.5.4
Re-attach to BOP Body ............................................................ 12
5.6
Modular Connection......................................................................... 12
5.6.1
Splitting the Connection ............................................................ 12
5.6.2
Re-Making the Connection ....................................................... 13
5.7
Maintenance Record Sheet ............................................................. 19
6
Testing .................................................................................................... 20
6.1
Prepare BOP for pressure testing .................................................... 20
6.2
Body Test ........................................................................................ 20
6.3
Wireline Ram Seal Test (Between the ram) ..................................... 21
6.4
Post Test Procedure ........................................................................ 21
7
Parts List and Drawings .......................................................................... 22
8
Spares .................................................................................................... 34
Содержание BOP System
Страница 9: ...User Manual Modular BOP System Dual OPS 3653 Rev A 4...
Страница 19: ...User Manual Modular BOP System Dual OPS 3653 Rev A 14...
Страница 20: ...User Manual Modular BOP System Dual OPS 3653 Rev A 15...
Страница 21: ...User Manual Modular BOP System Dual OPS 3653 Rev A 16...
Страница 22: ...User Manual Modular BOP System Dual OPS 3653 Rev A 17...
Страница 23: ...User Manual Modular BOP System Dual OPS 3653 Rev A 18...
Страница 28: ...User Manual Modular BOP System Dual OPS 3653 Rev A 23...
Страница 29: ...User Manual Modular BOP System Dual OPS 3653 Rev A 24 Figure 5 Modular BOP 192 3653 HV0...
Страница 31: ...User Manual Modular BOP System Dual OPS 3653 Rev A 26 Figure 6 Modular Body...
Страница 33: ...User Manual Modular BOP System Dual OPS 3653 Rev A 28 Figure 7 6 3 8 Actuator Part No 190 2476 HV0...