PHOTOWATT EDF ENR PWT Скачать руководство пользователя страница 9

 
 
EDF ENR PWT 

 

 

 

 

 

 

 

D06

P06

01

   

Indice

 

1

   

Date:

   

3

01

13

 

EDF

 

ENR

 

PWT

 

 

Société

 

par

 

actions

 

simplifiée

 

à

 

associé

 

unique

 

 

au

 

capital

 

de

 

37

 

505

 

000

 

 ‐ 

 

513

 

281

 

972

 

RCS

 

NANTERRE

 

Siège

 

social

 

:

 

100

 

Esplanade

 

du

 

Général

 

de

 

Gaulle

 

 

Cœur

 

Défense

 

 

Tour

 

B

 

92932

 

Paris

 

La

 

Défense

 

cedex

.

 

33,

 

Rue

 

Saint

 

Honoré

 ‐ 

Z.I.

 

Champfleuri

   

38300

 

Bourgoin

 

Jallieu

 ‐ 

France

 

Tel

 

:

 

04

 

74

 

93

 

80

 

20

 ‐ 

Fax

 

:

 

04

 

74

 

93

 

80

 

40

 

 

Clamp positions are of crucial importance for the reliability of the installation, the clamp centerlines must 

only be positioned as indicated in table 2, depending on the configuration and load. 

 

For the BIPV modules, please follow the specific Installation Manual. 

 

5.2  MODULE WIRING 

Correct wiring scheme 

   

 

When designing the system, avoid forming loops (to minimize risk in the event of an indirect lighting 

strike). Make sure that wiring is correct before starting up the system. If the measured open circuit voltage 

(Voc) and short-circuit current (Isc) differ from the specifications, then there is a wiring fault.     

Correct connection of plug connectors 

   

 

Make sure that the connection is safe and tight. The plug connector should not receive outer stress. The 

connector should only be used to connect the circuit. It should never be used to turn the circuit on and off.   

Use of suitable materials     

 

Use special solar cable and suitable plugs only (wiring should be placed in conduit that is sunlight-resistant 

if exposed) in accordance with local fire, building and electrical codes. Ensure that they are in perfect 

electrical and mechanical condition.     

 

The permitted type of solar cable is single conductor, 2.5-10 mm

2

 (8-14 AWG), 90°C wet rated, with proper 

insulation to withstand the maximum possible system open-circuit voltage (such as TUV 2PfG1169 

approved). The conductor material should be copper only. Select a suitable conductor gauge to minimize 

voltage drop. 

Cable protection 

   

 

Secure the cables to the mounting system using UV-resistant cable ties. Protect exposed cables from damage 

with appropriate precautions (e.g. locate them within plastic conduit). Avoid exposure to the direct sunlight. 

 

6.0  MAINTENANCE 

 

 

Regular maintenance is required to keep modules clear of snow, bird droppings, seeds, pollen, leaves, 

branches, dirt spots and dust.     

 

When there is a noticeable buildup of soiling deposits on the module surface, wash the PV array with water 

and a gentle cleaning implement (a sponge) during the cool part of the day. Dirt must never be scraped or 

rubbed away when dry, as this will cause micro-scratches.    

 

Do not use high pressure cleaning systems on modules 

 

If snow is present, a brush with soft bristles can be used to clean the surface of the module.     

 

Periodically inspect the system to make sure all wiring and supports stay intact.   

 

If you need electrical or mechanical inspection or maintenance, it is recommended to have a licensed, 

authorized professional carry out the job to avoid hazards of electric shock or injury. 

 

Do not change the PV components (diode, junction box, plug connectors). Doing so will void the warranty. 

9

Содержание EDF ENR PWT

Страница 1: ...hese instructions may result in death injury or property damage The installation of solar modules requires specialized skills and should only be performed by licensed professionals The word module or...

Страница 2: ...aterial to halt production of electricity when installing or working with a module or wiring Do not install or handle the modules when they are wet or during periods of high wind Do not use or install...

Страница 3: ...n factors table for open circuit voltage 4 0 STORAGE AND UNPACKING Precautions and General Safety Store modules in a dry and ventilated room Do not allow children and unauthorized persons near the ins...

Страница 4: ...s please ensure the assembly is mounted over a fire resistant roof covering rated for the application Photowatt modules have been listed as Class C according to UL790 standard PW series solar modules...

Страница 5: ...fixed in place in a manner suitable to withstand all expected loads including wind and snow loads A minimum clearance of 6 5 mm 1 4 of an inch or more between modules is required to allow for thermal...

Страница 6: ...r M5 size SS cup washer and M5 size SS nut with teeth is used to attach a copper grounding wire to grounding hole on the frame see picture above Attach the wire between the flat washer and the cup was...

Страница 7: ...g holes short side 6 Module frame 7 Cables and connectors The mounting design must be certified by a registered professional engineer The mounting design and procedures shall comply with local electri...

Страница 8: ...will void the warranty Each module must be securely fastened at a minimum of 4 points on two opposite sides If additional wind loads are anticipated for this installation additional mounting points s...

Страница 9: ...local fire building and electrical codes Ensure that they are in perfect electrical and mechanical condition The permitted type of solar cable is single conductor 2 5 10 mm2 8 14 AWG 90 C wet rated w...

Страница 10: ...ance Tel 04 74 93 80 20 Fax 04 74 93 80 40 ANNEX MECHANICALAND ELECTRICAL RATINGS Standard Test Conditions are irradiance of 1 kW m2 AM1 5 spectrum and cell temperature of 25 C Pmax of any individual...

Отзывы: