8 Work Modes

PC series inverters have the

 

following main work modes based on different conditions:

Mode1

Energy produced by the PV system priority for local load, 

excess energy is used

 

to charge the battery, finally 

remaining is delivered to the grid.

Mode2

If there is no PV, battery energy is used for local load 

first, the grid also can supply when the battery capacity 

is not enough.

Mode3

If the grid is fault or there is no grid, the system can still 

work, PV and batteries supply energy for local load.

Mode4

The battery can be charged by the grid, time and power 

of battery charging can be set up flexibly.

9 Trouble shooting

Q/A and Trouble Shooting on PC 

(+/-)

 

not reversed 

PLEASE CHECK THE FOLLOWING ITEMS AT THE FIRST INSTALLATION, MAKE SURE EVERYTHING IS FINE. OR PLEASE 
STOP INVERTER SYSTEM TILL EVERY THING CONFIRMED FINE OR CONTACT .

Checking Items                                                                      Checking Description 

Check items before PC 

start-up 

Battery connection           Confirm the connection between PC and battery : polarity ( +/-) not reversed 

PV INPUT connection 

Confirm the connection between PC and PV panels : polarity (+ /-) n ot 

reversed 

AC OUTPUT Connection 

power 

 Back-up to loads  : polarity 

Confirm ON-GRID connected to 

and

grid 

(+/-)not reversed 

PCmeter / CT connection 

Make sure PCmeter & CT connected between house loads and grid. and follow 

the House

Grid direction sign on CT. 

Checking items when start up system 

 

 

 

CT & PCmeter 

connection direction

BMS Communication

Checking details

1.  Check if the COM led on PCmeter triple blinking or not.
2.  Or connect Solar-Wifi, check in Phonocube App (“Parameters”) if  
     PCmeter COM state is “OK” or not.
     If COM led does not blink, or show “NG” on App, then please check 
     the connection between PCmeter and PC, like:
1.  RJ45 port broken or not;
2.  communication cable looses or broken?
3.  PCmeter should connect to PC RS485 port.
     If everything is Ok, but problem still there, please contact   
     after-sales services.

PCmeter 
Communication 
check

NOTE: do not need check if it is Lead-acid battery.
For lithium battery, please check following:
Connect Solar-Wifi, check on Phonocube APP (Parameter >>> Battery) if 
BMS status shows “BMS Communication OK” or not.
    If APP BMS Status on APP says“BMS Communication Failure”, please 
reboot PC. if problem is still there, please check further:
a.  check on Phonocube APP (Basic Setting) if Battery type is right what you 
have or not, if not right, please set it right in “Basic Setting”
b.  Connection between battery and PC is OK or not;
c.  communication cable looses or broken?
d.  RJ45 port/cables broken or not;
If everything is Ok, but problem still there, please contact after-
sales services.

1. Turn off PV and open Loads, check if R-P led is solid or not.
If “R-P” not solid, please check 
a.  if CT or PCmeter connected in a wrong direction (the arrow on 
     PCmeter & CT should point to grid);
b.  if connection between PCmeter and CT (port 1 and 4 on PCmeter) is 
     OK or not.
If both are OK but problem still there, please contact after-sales 
services.

19

20

Содержание PC3.0A1-S

Страница 1: ...340 00xxx 00 PC...

Страница 2: ...DRED Connection 4 8 Earth Fault Alarm 18 19 24 25 28 17 17 4 9 20 9 Trouble shooting 4 11 special backup application 28 13 Maintenance 2 3 Special illustration 03 07 06 05 16 16 16 15 17 15 14 13 11...

Страница 3: ...nd never be tipped over or slung 2 2 Safety Installation maintenance and connection of inverters must be performed by qualified personnel in compliance with local electrical standards wiring rules and...

Страница 4: ...ack up supply will be waken again 2 3 3 Battery protection d For lead acid batteries connecting with Hybrid inverter the SOC is calculated on inverter side As lead acid battery has various brands and...

Страница 5: ...on Please avoid direct sunlight rain exposure snow lay up when install In order to achieve optimal performance the ambient temperature should be lower than 45 C Direct Sunlight Rain Exposure Snow Lay...

Страница 6: ...8 Positive shall be red negative shall be black ToB attery To Battery communication cable To PCmeter communication cable House Grid 200mm 200mm Both sides 200mm 07 Phonocube To PCmeter Pcmeter PCmeter...

Страница 7: ...4 1 3 Negative connector Positive connector Inverter Special tools are used to stitching MC4 series AMPHENOL series Limit buckle can t crimping the wire 63 The terminal can be connected to earth wire...

Страница 8: ...as the PE line is longer than L and N Neutral conductor shall be blue line conductor shall be black or brown preferred protective earth bonding line shall be yellow green Note 2300VA 25A 30mA 1 1 5 In...

Страница 9: ...by remove the communication cover then put the communication cover back and install the waterproof terminal The To Meter communication cable attached on inverter can be extended to max 100m but for t...

Страница 10: ...is successful Refer to Figure 4 7 1 4 7 DRED Connection 1 DRED connection is only available for Australia and New Zealand 2 Supported DRM command DRM0 DRM1 DRM2 DRM3 DRM4 DRM5 DRM6 DRM7 DRM8 4 9 Syst...

Страница 11: ...p For the detailed operation of this function please check instructions on Phonocube App 6 CEI Auto Test Power limit function Introduction 17 18 1 2 3 SP3T 1 Loads is supplied from back up side 2 Load...

Страница 12: ...m CT PCmeter connection direction BMS Communication Checking details 1 Check if the COM led on PCmeter triple blinking or not 2 Or connect Solar Wifi check in Phonocube App Parameters if PCmeter COM s...

Страница 13: ...n Battery charge discharge Check items 1 Check if there is a fluctuation on load power 2 Check if there is a fluctuation on PV power on Portal If everything is OK please contact after sales Services C...

Страница 14: ...tery is 48V max charge voltage 60V 3 For example serial connection of 4 12V 100Ah lead acid battery the capacity will still be 100Ah An error message will be displayed on the APP if a fault occurs Tab...

Страница 15: ...Overvoltage Category External Environment Pollution Degree Cooling Noise dB User Interface Communication with BMS Communication with Meter Weight kg Size Width Height Depth mm Mounting Output THDv li...

Страница 16: ...main distribution board Examples are switchgear and other equipment in an industrial installation Category IV applies to equipment permanently connected at the origin of an installation upstream of t...

Отзывы: