ZP-43 SLIM/2 X
Instruction manual
™
- 6 -
© Copyright 2022 Phoenix Professional Audio GmbH, www.phoenix-pa.com
Phoenix logo is registered with the DE Patent and Trademark Office (TM)
All trademarks are the property of their respective owners
- 6 -
16.- LINE INPUT ON RCA
Line input (0 dB) with volume control No. 14, LF and HF EQ control No. 13 for e.g. CD player feed.
17/18.- POWER ON/OFF SWITCH WITH OPERATION INDICATOR
After pressing this switch, the device is ready for operation. The green LED indicator lights up when the device
is switched on (POWER ON).
The ZP-43 SLIM/2 X procession system can also be connected to the charger (charging process active) during
operation.
19.- BATTERY OPERATION INDICATOR
LED indicator bar between LOW-BATT, 25%-75%-100% battery capacity.
The red LOW-BATT LED display does not light up when the procession system is switched on (POWER ON)
and the battery is sufficiently charged or has enough energy for operation.
The LOW-BATT LED display only lights up „RED“ when the battery is discharged and only residual energy is
available for operating the system. The system must then be loaded!
IMPORTANT:
If the red LED display activates, you have around 30 seconds to connect the procession system to the charger.
The system is switched off by the monitoring system and the deep discharge protection is active.
The ZP-43 SLIM/2 X procession system can also be connected to the charger (charging process active) and
charged during operation.
Please carry out the charging process until the yellow LED display no. 20 [LOAD] offs.
20.- LOAD OPERATION INDICATOR
The yellow LED indicator lights up when the automatic charging system is activated and only until the battery
is fully charged.
Please carry out the loading process as follows:
1 Plug the charger‘s coupling socket into input no. 21.
2 Supply the supplied charger with mains voltage 230VAC/50Hz /OUT 24VDC.
The charging process is activated automatically and the yellow LED indicator lights up. This process can take
up to 14 hours.
The charging process is automatically interrupted when the battery is fully charged.
Personal monitoring of the charging process by the user is not necessary.
IMPORTANT:
3- If the [LOAD] display has gone out, please first disconnect the charger from the mains voltage and then disconnect
the charger from the procession system or the plug from socket no. 24 [24VDC].
If the procession system has not been used for more than three months, the battery should be serviced or
recharged.
FRONT PANEL CONTROLS