HD7855/60 / HD7856/60
7-24
REPAIR INSTRUCTION
Boiler / Brew chamber
1. Brewhead sensor wire must be taped as far away from
the boiler wires as possible. (EMC)
2. Boiler wires over the boiler, not behind or in front of
the boiler. (Safety)
2
1
PCBA – Ty wraps
After PCBA replacement:
1. Ty-wrap Black, Yellow and White lead close to the
connection of the white lead on the PCBA. (Safety)
2. Ty-wrap Black, Yellow, White, Blue and Red lead close
to the connection of the red lead on the PCBA.
(Safety)
3. Ty-wrap Black, Yellow, White, Blue, Red and 4x brown
close to the connection of the lowest two brown
wires on the PCBA. (Safety)
1
3
2
Cordset, Earthwire and Thermoblock
1. Ferrite bead must be in place and ty-wrapped to fi lter
out interference. (EMC)
2. “Clean” Brown and Blue wire must be ty-wrapped to
Earth-wire close the Thermo-block. Earth-wire must
be as far away from the cord-set as possible. (EMC)
3. Two Black fuse-wires to Thermo-block must run
horizontal to the right, running behind the Steam-
pump. (Safety)
3
2
1
Содержание Senseo Latte Duo HD7855/60
Страница 16: ...HD7855 60 HD7856 60 16 24 110 130 120 140 150 160 1 2 EXPLODEDVIEW ...
Страница 17: ...HD7855 60 HD7856 60 17 24 9 620 8 610 1010 1020 1030 1040 1050 6 3 4 5 10 EXPLODEDVIEW ...
Страница 18: ...HD7855 60 HD7856 60 18 24 A 4x i a Q 1230 1220 1210 12 14 13 11 EXPLODEDVIEW ...
Страница 19: ...HD7855 60 HD7856 60 19 24 B B 16 17 15 18 EXPLODEDVIEW ...
Страница 20: ...HD7855 60 HD7856 60 20 24 p f jj g C N 2110 20 19 24 23 22 21 EXPLODEDVIEW ...
Страница 24: ...HD7855 60 HD7856 60 24 24 G G G H V W Z 33110 33100 35 2x 34 EXPLODEDVIEW ...