PAS 280 Operation Guide
5. Recommended Flight Operation Procedure
Page 33 of 46
5
Recommended Flight Operation Procedure
The following procedure is used by Phase One in operational test flights of the cameras. Users should adapt
these procedures for their own needs.
5.1
Before Flight
5.1.1
Before Power On
1.
All cable connections - verify they are correct and secure.
2.
iX Controller CONTROLLER circuit breaker - verify pushed in.
3.
iX Controller CAMERA circuit breaker - verify pushed in.
4.
SOMAG stabilizer POWER SWITCH - verify set to ON.
5.1.2
After Power On
5.1.2.1
POS AV
1.
Verify configuration and lever arm settings using the Applanix GPS GUI.
5.1.2.2
iX Capture
1.
Click the iX Capture icon.
2.
Verify that the application is connected to the camera.
3.
In iX Capture, verify that iX-C-FMS is set to FMS.
4.
Click Settings > System and set LOG
LEVEL to Normal.
Содержание PAS 280
Страница 1: ...PAS 280 Operation Guide Version 1 0 5 Date November 13 2022...
Страница 37: ...PAS 280 Operation Guide 5 Recommended Flight Operation Procedure Page 37 of 46 5 4 Post Flight Data download...
Страница 41: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 41 of 46 A 1 iX Controller MK4...
Страница 42: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 42 of 46 A 2 iXM RS 280F Camera...
Страница 43: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 43 of 46 A 3 iXM RS 150F Achromatic Camera...
Страница 44: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 44 of 46 A 4 POS AV V6...
Страница 45: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 45 of 46...
Страница 46: ...PAS 280 Operation Guide Appendix A Declarations of Conformity Page 46 of 46...