SWING M delivery pump / Part 2 Overview, operation and service
Operation
5.3.6
Add material to the machine
Figure 27: Fill material
1. Fill the machine with material.
NOTE
Formation of tunnels:
Due to the material’s physical properties, the material
can partially adhere to the sides of the material hopper,
resulting in the formation of tunnels. The mortar level in
the material hopper should not be higher than absolutely
necessary.
5.4
Shutdown in case of emergency
Shutdown in case of emergency
In dangerous situations, machine movements have to be stopped as
quickly as possible, and the power supply has to be disconnected.
1
2
Figure 28: Stopping
In case of danger proceed as follows:
1. Immediately press the red pushbutton (1) control voltage "OFF".
2. Disconnect the power supply (2) by removing the connection cable.
3. Inform responsible person at the operational site.
4. If necessary call for medical assistance and fire brigade.
5. Recover persons from the danger zone, initiate First Aid measures.
6. Keep access routes free for emergency vehicles.
7. If the severity of the emergency permits, inform the competent
authorities.
8. Assign specialised personnel with the troubleshooting.
After the rescue operations
WARNING
Danger to life from premature reactivation!
On reactivation there is danger to life for all persons in the
danger zone.
Ensure that the danger zone is clear before switching
the machine back on.
Check the system before reactivation and ensure that
all safety equipment is installed and functional.
9. Check the system before reactivation and ensure that all safety
equipment is installed and functional.