15708-1500 | Rev H | 2022-02-01 | e-mail [email protected]
Section
19
| 1
Section
19
|
Installation
Questionnaire
www.pflow.com
P 414 352 9000
F 414 352 9002
6720 N. Teutonia Ave.
Milwaukee, WI 53209
Yes
✓
No
✓
Product Perception
Was the equipment shipment complete as expected?
What items were missing, if any?
Was the equipment in good condition?
Describe the equipment damage or concerns with the workmanship, if any.
Did the equipment match the General Arrangement (GA) drawing?
Was the equipment dimensionally correct with form, fit, and function?
Describe any problem areas in detail.
Electrical Installation
Was the electrical field wiring completed as required?
Were there any issues with the electrical components?
After the electrical installation was completed, was it necessary to return for
final adjustments, testing, and training?
Were you made aware of any electrical problems?
Describe any “No” answers in detail.
Testing
Was the equipment tested at full load capacity?
Were all gates tested to ensure proper operation and interlock operation?
PFlow Industries, Inc. would like to thank you for the opportunity to serve you. Your
business is appreciated. Please help us to ensure that your expectations are met by
taking a few minutes to tell us about the equipment and service that you have received.
Complete the Installation Questionnaire and Acceptance Certificate. Return both forms
to PFlow Industries, Inc. via e-mail to [email protected] Additional space for comments is
available on the next page.
Thank You
PFlow Serial Number
Customer/User
Date
Questionnaire
Completed by
E-mail Address
Company
Phone Number