background image

Page 8

INSTALLATION Cont...

• 

Remove the flange and scribe a second circle that has a radius 15mm larger than the first.

• 

Cut out around the larger circle (x+15mm radius) and clean up around the hole.

•  Liberally apply sealant around the edge of the hole

X

X + 15 

Spread sealant on 

flange liberally.  

TIP

Our current product is Sikaflex PRO 

which we have found good in sealing 

polyethylene to polyethylene.

• 

Place the flange in the hole. Drill pilot holes and fasten in place 

with the stainless steel self tapping screws provided. Check that 

the Waste Chute fits vertically through the floor before finally 

sealing and screwing.

•  Place the Waste Chute in position and place the toilet pedestal 

onto the Waste Chute.  Measure the distance Y (height of 

Pedestal above floor).

•  Remove the Waste Chute and cut off the measured distance 

from the length of the Waste Chute. NB - one end of the Chute 

has a socket, which is provided for when more than one Chute 

are joined together - this end should be cut off so the final Chute 

is smooth and straight.

Waste

Chute

Flange

Floor

• 

Replace the Waste Chute.  Seal with sealant the inside pedestal lip, where the Waste Chute meets the 

pedestal.  Fix the pedestal to the floor.

Waste

Chute

Sealant

Sealant

Fixing Vent Pipes

Two Vent Pipe connection Pods are supplied with the Maxi RL2000:

• 

One with a hole cut for a 100mm DWV pipe - this is the Inlet connector

• 

One with a hole cut for a 150mm DWV pipe - this is the Outlet connector

• 

The vent pipes are not supplied with the kit as each installation will be unique.  All connections are 

designed to fit standard 100 and 150 DWV PVC pipe.

• 

Keep bends in vent pipes to 45 degree - 90 degree bends are too sharp and slow the airflow 

unnecessarily.

Содержание ROTA-LOO Maxi RL2000

Страница 1: ...RL2000 Owners Manual Compostable Batch Cycle Toilet System Proudly manufactured in Australia by PFG Group Victoria 87 93 Tramway Road Morwell Victoria 3840 www rotaloo com au...

Страница 2: ...e under cover OceanaMark OPMK30059 AS NZS 1546 2 PFG Group Victoria Pty Ltd is a Quality Assured company certified as compliant to ISO9001 2015 AS NZS 1546 2 2008 is the Standard that sets out the req...

Страница 3: ...omposition it is important to keep the moisture containment of the material below 70 and ideally between 50 and 60 As fecal matter is 70 80 moisture and urine about 95 for a WCT to work correctly ther...

Страница 4: ...nment Upon full rotation bringing the original bucket back rotation brings it back to the pedestal composting should be complete and the Humus can be disposed of Composting time is dependent on the pi...

Страница 5: ...o to sit Installing the ventilation pipe work including vent pods inlet fan and Turbo Vent Connecting the Pedestal waste chute and Rota Loo Final checks before use 4 PREPARATION BUILDING DESIGN Space...

Страница 6: ...ny excess liquid your site needs to have a patch of level diggable ground adjacent to the building If your building is going to have a suspended concrete floor it is best not to use the chutes as form...

Страница 7: ...et inlet Filter needs to be located lower than the Pedestal otherwise you will draw air from the toilet cubicle rather than where the air inlet is located To draw warm air down from ceiling cavities t...

Страница 8: ...he pedestal in position and check that with the waste chute centre lined up there is adequate clearance of the pedestal to walls 2 Drill a small hole in the centre of the marked chute hole position th...

Страница 9: ...ve floor Remove the Waste Chute and cut off the measured distance from the length of the Waste Chute NB one end of the Chute has a socket which is provided for when more than one Chute are joined toge...

Страница 10: ...et pipe see figure adjacent and should be positioned on the side of the unit approximately 200mm from the bottom The air inlet is attached to the 1OOmm 45 connector From the connector run the air inta...

Страница 11: ...ural process is complete Make sure the vent cap is at least 600mm above the ridge line of your roof so that you don t experience down drafts Trees close to the vent cap can also cause down draft probl...

Страница 12: ...to and slightly lower then the Rota Loo on the North side under a Soltran enclosure see picture Page 5 Connect the Rota Loo to the ELT via pipe rigid or flexible between the 40mm pipe nipples Connect...

Страница 13: ...rd against disease transmission OPERATIONS OPERATING THE ROTA LOO Each installation will be slightly different because we all have different lifestyles and diets and we live in different climates Rota...

Страница 14: ...ota Loo when bin is full and rotated the bin presented for use needs to be emptied Open the door rotate the full bin as noted above and remove the bin presented Under normal use this bin will have bee...

Страница 15: ...nt to a minimum and wherever possible use only biodegradable disinfectant When using disinfectant use it only on a damp sponge around the pedestal and seat areas to prevent any spillage Be careful tha...

Страница 16: ...ed or an excess liquid handling system should be constructed If the turntable won t rotate Check for obstructions On the RL650 the bins are quite close to the chamber sides and it may be that a bin ha...

Страница 17: ...ic rate of aerobic bacteria therefore increasing the compost rate and producing less gases to attract the flies It is also recommended that a pyrethrum natural insect repellent spray or powder be adde...

Страница 18: ...nusual situations The manufacturers contact details are included on the serial number plate for contact in unknown situations Storage of and access to Uncomposted Material Being fully self contained a...

Страница 19: ...lking Material is Fed in While the addition of bulking material is recommended it is not essential for effective composting The use of toilet paper and the design to drain the compost pile of moisture...

Страница 20: ...n provides for a factor of safety in time for composting In the case of very high use when compost may be removed before the designed 12 months instructions stipulate storing in additional bins Operat...

Страница 21: ...ve and is recommended RL650 and RL950 Lids can be removed from outside the unit ROTA LOO WARRANTY We stand by our product and provide as much support as we can The Rota Loo and associated products are...

Страница 22: ...use accident or alteration or damage caused by fire flood acts of God or any other casualty 2 Parts and accessories not sold by PFG Group Victoria Pty Ltd or damage resulting from the use of such item...

Страница 23: ...fan 12 volt Solar fan or 240 volt fan complete with power lead Accessories RL2000 filter pack of 8 filters 1 litre bottle of bio stimulant Any optional items ordered will be shown on the batch release...

Страница 24: ...900 Use gloves eye protection and a dust mask to protect yourself from any residual pathogens that may exist Bury under 300mm of soil for 3 months or as required by your local authority If contact is...

Отзывы: