![Pfeiffer Vacuum OME 16 ATEX Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/pfeiffer-vacuum/ome-16-atex/ome-16-atex_operating-instructions-manual_1535035010.webp)
10
Installation
OME 16 M
OME 25 M
OME 25 ML
Fig. 3:
Duo 10 M withOMEand ODK
Screw in hose connection 221 in place of the operating fluid drain screw 33; take care
with O-ring 145.
Remove gas ballast valve 42 from the pump and absorb the operating fluid under-
neath.
Re-fit the gas ballast valve 42 with intermediate flange 45 and screw tight with longer
screws (torque:
2.5 Nm
); take care with O-ring 148.
Screw fitting/hose nipple 220 into intermediate flange 45 and tighten slightly; pay at-
tention to O-ring 138.
Fit operating fluid return hose 222 at both sides,
– keep the hose as short as possible and protect it from bending.
Fasten hose clips 223.
33
Operating fluid drain screw
42
Gas ballast valve
45
Intermediate flange
138 O-ring
145 O-ring
148 O-ring
220 Hose nipple
221 Hose piece
222 Operating fluid return line
223 Hose clip
OME
222
42
223
223
45/148
220/138
221/145
33