1
(2×)
Fig. 14:
Backing pump transportation lock
1 Knurled screw on transportation lock
Procedure
1. Turn the knurled screw on the transportation lock upwards to the stop.
2. Release the transportation lock on the opposite side.
5.7 Fill operating fluid
NOTICE
Risk of damage due to the use of non-approved operating fluid
Product-specific performance data are not achieved. All liability and warranty claims against Pfeiffer
Vacuum are also excluded.
► Only use approved operating fluids.
► Only use other application-specific operating fluids after consultation with Pfeiffer Vacuum.
Use of operating fluids
Only applies to HiCube Pro with rotary vane pump as backing pump.
● The operating fluid for rotary vane pumps is included in the scope of delivery.
● The operating fluid reservoir on the turbopump is already filled and installed.
● The dry-sealing ACP backing pump is filled with lubricant ex factory.
● The dry-sealing scroll pump does not need lubricant.
Permissible operating fluid
● P3 (standard operating fluid)
Read the operating fluid type on the rating plate
► Refer to the rating plate of the vacuum pump for type and quantity of intended operating fluid.
Installation
32/80
Содержание HiCube 300 H Pro
Страница 1: ...OPERATING INSTRUCTIONS EN Translation of the Original HICUBE PRO Turbo pumping stations...
Страница 79: ...79 80...
Страница 80: ...PT0265 ed F Date 2010 P N PT0265BEN...