
2 - 4
Adjustment
2.07
Positioning the ball stud
Requirement
In a vertical position the ball stud
1
must
1. be located in the middle of actuator
5
and
2. have a clearance of
0.5 mm
to the bottom of actuator
5
.
●
Set ball stud
1
in a vertical position.
●
Adjust bracket
2
(screws
3
) according to
requirement 1
.
●
Turn ball stud
1
(nut
4
) according to
requirement 2
.
Fig. 2 - 03
5
1
5
4
1
0.5 mm
2
3