5. Commissioning  / Winterise 

 
5.1   Commissioning 

 

a)  Check of electrical function : 

Before the water supply to the valve is opened, the coil has to be triggered through a control 
unit. Through an acoustic “click” on the coil, the correct electrical function can be 
determined. (The click arise through attracting the relay armature.) 

 

b)  Make sure that the manual operation stands on AUTO or OFF (Turn screw totally in or 

out). In both positions it is warrant that the valve closes after the water supply. 

 
c)  Open water supply to the sprinkler slowly. Probably the valve opens for a short time, but 

after 30 sec. it should close on its own. 

 

              picture 1 
 
 
 

d)  After opening the water supply and after the max. working / operation pressure is reached, 

every seal has to be checked / examined. 

 
e)  Check valves and sprinkler for perfect function, when opening the valve manual. 

That can be executed by turning the manual operation to the right, until the sprinkler head 
pops up. So that the water jet do not hit the operator, the manual operation should be 
opened carefully. You can see the spray direction of the sprinkler on the out gushing water 
and so the operator can see where he has to stay for not getting wet. 

 

f)  The desired pressure on the sprinkler nozzle, can be adjusted on the pressure regulation 

screw while the sprinkler is working.  

 If on the sprinkler nozzle the min. pressure is adjusted, there is appr. 3 bar pressure on 

the nozzle. 
 

Pressure regulation 

Manual operation 

Содержание LVZE 22-1 VAC

Страница 1: ...D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de Maintenance and Operating Instructions PERROT Pop up sprinkler...

Страница 2: ...perienced in the field of irrigation Therefore we have kept this instruction as brief as possible and have included such information only which you must have for the use of this product A guarantee ca...

Страница 3: ...his paragraph the special safety instructions included in other paragraphs of these operating instructions have to be observed also 2 1 Symbols of hints given in these operating instructions The non o...

Страница 4: ...he sprinkler is 1 female thread For sealing the thread hemp and a jointing compound has to be used e g Fermit special Installation of the sprinkler should occur according to the Installation layout fo...

Страница 5: ...DP018 Page 5 12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot d...

Страница 6: ...inkler slowly Probably the valve opens for a short time but after 30 sec it should close on its own picture 1 d After opening the water supply and after the max working operation pressure is reached e...

Страница 7: ...st be set on position AUTO than the sprinkler have to close i Check electrical function by turning on and off the sprinkler with help of a control unit 5 2 Winterise Before beginning of the frost peri...

Страница 8: ...12 Perrot REGNERBAU CALW GmbH Industriestra e 19 27 D 75382 Althengstett Germany Telefon 0049 7051 162 0 Fax 0049 7051 162 133 E mail perrot perrot de E mail Konstruktion technik perrot de picture 2...

Страница 9: ...e cover can be removed Unscrew bolt 4x SW10 43 with socket wrench 21 and pull out sprinkler insert 5 7 1 2 Disassembly valve piston picture 2 3 Before the following mentioned work is carried out it mu...

Страница 10: ...be flushed before assembling Assemble flushing equipment 23 in the sprinkler housing see picture 4 and open water supply Connect hose on flushing equipment so that water can be derived picture 4 7 2 2...

Страница 11: ...longest control pipe in the screw connection at the coil side Left side view X Examine right clamping by drawing control pipe picture 5 7 2 4 Sprinkler assembly Plug in sprinkler insert 5 in guide hou...

Страница 12: ...Valve does not open even not manual Seal of valve insert is defect Change valve insert see point 7 1 2 Control water exit on cylinder of the valve is blocked Disassembly control pipe out off connecti...

Отзывы: