PERODUA 2005 Myvi M300 Скачать руководство пользователя страница 12

B1–6

A

EJ

B

3. After loosening, lightly tighten the bolts (A) by hand.
4. Adjust the tension by turning the adjusting bolt of the ad-

justing bar.

5. Tighten the bolts (A) for retaining the adjusting bar.
6. Tighten the bolts (B) for retaining the alternator

TIGHTENING TORQUE (K3):

Bolt A
19.0

&

3.8N

;

m

{190

&

38kgf

;

cm}

Bolt B
44.0

&

8.8N

;

m

{450

&

90kgf

;

cm}

TIGHTENING TORQUE (EJ):

Bolt A
29.0

&

5.8N

;

m

{295.6

&

59.1kgf

;

cm}

Bolt B
52.0

&

10.4N

;

m

{530

&

106kgf

;

cm}

7. Confirm the belt tension.

1-2-8

CHECK AND ADJUSTMENT OF VALVE CLEARANCE

EJ

Please refer to section B2.

K3
(1) Specified value

(2) Check

NOTE

For  the  removal  and  installation  procedures  of  each
part, refer to the section under “Removal and Installa-
tion of Camshaft.”

Refer to Page B2-12.

1. Remove the cylinder head cover.
2. Turn the crankshaft in the normal direction, until the tim-

ing mark of the crankshaft pulley is aligned with the indi-
cator of the timing chain cover.

3. Ensure that the mating marks at the top of the drive gear

and  driven  gear  of  the  camshaft  are  aligned  with  each
other.  If they are not aligned, make one more turn so that
the mating marks are aligned.

4. Using  a  thickness  gauge,  check  the  valve  clearances

shown in the right figure.

 J04E6058ET10

Mate mark

 J04E6007T10

TKOS143-00006343E

TKOS143-00006344E

Cylinder No.1

Cylinder No.2

Cylinder No.3

Cylinder No.4

IN 

EX 

IN 

EX 

IN 

EX 

IN 

EX 

<

<

<

(

(

<

(

(

Valve clearance (mm) 

IN 

0.18

'

0.055

(

0.035

Vehicle mounted with Type 

K3-VE engine 

EX 

During cold pe-

riod 

0.31

'

0.055

(

0.035

T11E6011T10

A

B

K3

Содержание 2005 Myvi M300

Страница 1: ...PERODUA MYVI WORKSHOP MANUAL PERODUA MYVI K3 EJEV 2010 By www e bookmanual com SINCE 2003 Copyright 2014 e bookmanual com Your e manual solution source ...

Страница 2: ...SAMPLE WORKSHOP MANUAL 111O PAGE 18 1 MB ONLY USD 19 90 ...

Страница 3: ...n Date hour of transaction and fill the form at contact form or send to pay e bookmanual com Maybank Account Number Acc Holder Name DZULKIFLEE Acc Number 152068638890 Bank Islam Account Number Acc Holder Name DZULKIFLEE Acc Number 02039020168377 CIMB Bank Account Number Acc Holder Name DZULKIFLEE Acc Number 02110042053522 You will receive the download link in 24hour after the payment verified from...

Страница 4: ...al refer to the following manuals All information used in this service manual was in effect at time when the manual was printed However the specifications and procedures may be revised owing to continuing improvements in design without advance notice and without incurring any obligation to us Published in May 2005 PERODUA SALES SDN BHD 2005 PERODUA SALES SDN BHD All rights reserved This material m...

Страница 5: ...1 ADJUSTMENT OPERATION CONFIRMATION A1 11 HANDLING OF HOSE OR THE LIKE A1 11 TOUCH UP A1 11 SUPPORTING POINTS FOR JACKS AND SAFETY STANDS A1 12 A1 SUPPORTING POINTS OF LIFTS A1 14 TOWING INSTRUCTIONS A1 15 TOWING WITH ROPE ONLY FOR EMERGENCY A1 15 USING FLAT BED TRUCK A1 15 WHEEL LIFT TYPE A1 15 DIAGNOSTICS INSTRUCTIONS A1 16 HOW TO PROCEED DIAGNOSIS A1 16 DATA LINK CONNECTOR A1 19 ARRANGEMENT OF ...

Страница 6: ...ar section of the camshaft No 1 using a bolt M5 size with a 0 8 mm pitch 7 Remove the camshaft bearing cap No 2 by removing the bolts in a sequence as indicated in the right figure w r t e q w 0 y r 2 i u q o t 1 e Sub gear hold bolt 10 Removal of camshaft bearing cap No 1 and camshaft bearing cap No 2 1 Using the hexagonal section of the camshaft No 2 set the mating marks of the camshaft gear sec...

Страница 7: ...ificant poor contact is present 2 Be sure to wipe off the chalk 2 Cylinder Assy disc brake rear 1 Check the cylinder assembly for corrosion and damage 3 Plate S A brake backing rear RH LH 1 Check the plate subassembly for wear and damage 13 1 6 POINTS OF INSTALLATION 1 Hub bearing Assy rear axle 1 Connect the connector of the speed sensor wire to the hub bearing assembly Then install the hub beari...

Страница 8: ... REMOVAL AND INSTALLATION PROCEDURES 1 Components 2 Removal and installation procedures T11B5024S33 T 9 0 5 7 92 57 a b B N TKOS143_00007993E 1 a Lever S A back door lock open i 2 b Cable S A fuel lid lock control ...

Страница 9: ...n Date hour of transaction and fill the form at contact form or send to pay e bookmanual com Maybank Account Number Acc Holder Name DZULKIFLEE Acc Number 152068638890 Bank Islam Account Number Acc Holder Name DZULKIFLEE Acc Number 02039020168377 CIMB Bank Account Number Acc Holder Name DZULKIFLEE Acc Number 02110042053522 You will receive the download link in 24hour after the payment verified from...

Страница 10: ...B1 ENGINE K3 EJ PERODUA MYVI K3 EJ ENGINE B1 1 ITEMS TO BE PREPARED B1 1 BASIC CHECK AND ADJUSTMENT B1 2 B1 ...

Страница 11: ...sion should be adjusted to the mid value of the specified value for When a new part is installed As regards the belt that has been used for more than five minutes ensure that the belt tension conforms to the specified value for During inspection When the belt that has been used for more than five minutes is assembled the belt tension should be adjusted to the mid value of the specified value for D...

Страница 12: ...he section under Removal and Installa tion of Camshaft Refer to Page B2 12 1 Remove the cylinder head cover 2 Turn the crankshaft in the normal direction until the tim ing mark of the crankshaft pulley is aligned with the indi cator of the timing chain cover 3 Ensure that the mating marks at the top of the drive gear and driven gear of the camshaft are aligned with each other If they are not align...

Страница 13: ...anteed Privacy Rest assured that The e bookmanual does not share any customer related information with any other organisations Privacy Statement The information The e bookmanual receives from you is retained by us and used to correctly identify and correspond with our customers so that we can personalise and continually improve your shopping experience with us We fully respect your privacy and val...

Отзывы: