For the dual pump system please follow this set up: 
 
Fig 2 

  

 
The dual pump system is designed to have one pump as the master pump and the second as a backup in case of 
master pump failure or a sudden water in rush above and beyond the normal volume expected. 
 
It is important to designate the master and backup pump at this point. 

 

1.

 

For both the master and backup pump use PTFE tape around the thread of the non-return valve then 
screw the waste pipework to the connection firmly.  

2.

 

For both the master and the backup mount the float arm onto the waste pipe using the jubilee clip. As 
per fig 1. 

3.

 

At this point both pumps will activate at the same time as both float arms are set to their highest 
activation point. It is now essential that the rubber grommet at the top of the master pumps float arm is 
moved downwards so the master pump activates first (see fig 2). 

4.

 

Now install the High level Alarm Switch on the master pump waste pipe just above the pump activation 
point. (see fig 2) This will ensure that the alarm will sound if the master pump has activated but cannot 
cope with the volume of water entering the chamber or if the pump fails. 

Содержание PermaSEAL

Страница 1: ...Page 1 BASEMENT SUMP AND PUMP SYSTEM Installation and Operation Guidelines...

Страница 2: ...Page 2 Contents 1 Product Summary 03 2 Installation Guidelines 03 3 Technical Specification 08 4 Dimensions 08 5 Parts List 08 6 Maintenance 09 7 Health and Safety 09 8 Guarantee 10...

Страница 3: ...or to work commencing The tank is manufactured from polyethylene and as such is extremely robust However as with any preformed tank they are susceptible to floatation and hydrostatic pressures exerted...

Страница 4: ...e pump s are set up with the waste pipework float arms and alarm outside of the sump chamber to ensure correct fitting For the single pump system please follow this set up 1 Use PTFE tape around the t...

Страница 5: ...ion firmly 2 For both the master and the backup mount the float arm onto the waste pipe using the jubilee clip As per fig 1 3 At this point both pumps will activate at the same time as both float arms...

Страница 6: ...tion setting levels may need to be finely tuned when the pumps are in the chamber and water levels can be tested Once the pump or pumps are set up the internal waste pipe connections can be made Simpl...

Страница 7: ...not exceed 150mm at any time Please ensure that when pouring the concrete backfill suitable steps are taken to prevent the concrete from entering the tank and drainage channel 8 Where groundwater is p...

Страница 8: ...Parts List Locked Sealed Lid Frame with 46mm recess One or two CP 250 Pumps 50mm pressure rated pipe work including a shut off valve and non return pump connection Single pump systems have a single i...

Страница 9: ...systems must be vaccinated against diseases to which they may be exposed A first aid kit must be close to hand Note that special rules apply to installations in an explosive atmosphere Special note s...

Страница 10: ...placing the defective part at the company s premises inside normal working hours We exclude all liability for any consequential or other damage or losses which may occur We will not be liable if the p...

Отзывы: