IDS-509C Switches Quick Start Guide P/N 5500365-10 (Rev A)

                                      

                                      

 

Wiring the Terminal Block 

 

Connecting the switch to ground (optional) 

If your installation requires additional grounding, refer to the Hardware Installation 
Guide for information on connecting ground. 

Connecting power to the IDS switch 

You may connect both sets of power inputs to provide redundant power. 

 

1.

 

Ensure the power source is off prior to connection.

 

2.

 

Using a pair of 12-20AWG wires, strip them both 7-8mm (5/16”).

 

3.

 

Loosen the terminal block screws and connect positive (+) / negative (-) wires in 
the +/- terminals.

 

4.

 

Tighten terminal screws (0.51Nm torque). Ensure the wires are securely fastened.

 

5.

 

Re-insert the terminal block connector if removed. Turn power on at source. 
Check LED indicators for status.

 

6.

 

Connect P2 (power source 2, beginning at Step 1.

 

 

For complete wiring instructions and for all Hazardous Locations and 
general safety warnings consult the Hardware Installation Guide. 

 

Inserting a SFP Module 

Before connecting fiber cable to the switch, the SFP(s) must be installed, following 
the procedure below. 

1.

 

Carefully align the SFP with the slot, ensuring the latching mechanisms will 
line up. Also ensure the bale on the SFP is closed. 

2.

 

Slide the SFP until the connector is seated in the slot and latched.  If you are 
unable to fully insert the SFP, reverse the orientation and retry. 

 

Connecting a fiber device 

Insert SFP(s) into an SFP slot(s) and connect the LC fiber cable to the SFP(s).  Each 
SFP is part of a combo ports, the switch will use the first of the Ethernet/SFP pair that 
establishes a link. 

Содержание IDS-509C

Страница 1: ...anaged Switches User Guide Pro Feature Set IDS Managed Switches CLI Guide Pro Feature Set What s in the box The IDS switch Quick Start Guide this document Hardware Overview Front View Back View 1 Terminal Block for Power 1 2 7 Ethernet Ports 2 Status LEDs 8 SD card slot 3 Console Port serial 9 Terminal Block Relay I O 4 Console Port USB 10 Reset FS Fast Setup 5 DIP switches 11 Wall Mount Bracket S...

Страница 2: ...connector if removed Turn power on at source Check LED indicators for status 6 Connect P2 power source 2 beginning at Step 1 For complete wiring instructions and for all Hazardous Locations and general safety warnings consult the Hardware Installation Guide Inserting a SFP Module Before connecting fiber cable to the switch the SFP s must be installed following the procedure below 1 Carefully align...

Страница 3: ...cations Red Neither P1 or P2 providing power within specifications SYS System status Green blinking System booting Green solid System operating normally Green blinking fast Fast Setup mode activated Red Hardware fault or firmware load error Ethernet Port Link Speed Green and Yellow LEDs 1000 Mbps Green on Yellow off 100 Mbps Green on Yellow on 10 Mbps Green off Yellow on Note Blinking indicates ac...

Страница 4: ... recessed in the switch a small tool such as a paper clip will be required The yellow and green LEDs on an unused RJ 45 connector will flash rapidly to indicate where to plug in the Ethernet cable from your PC 3 Using a web browser enter to a well known webpage such as www google com you will be automatically directed to the IDS Get Started screen Note While in Fast setup mode the IDS switch will ...

Отзывы: