![Pergola Depot Fedora Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/pergola-depot/fedora/fedora_assembly-instructions-manual_1529900002.webp)
Tools and Supplies Needed
o
Helper (we recommend at least 2 helpers)
o
Tape measure, hammer, level
o
Ladder (tall enough to work the top of your pergola during assembly)
o
Screw gun (a star drive bit is supplied with kit)
o
3/4”
Wrench
o
For new footings: post hole digger, dry concrete mix, gravel, trowel, shovel and mixing bin
or wheel barrow
o
For installing rebar into post (if posts going into new concrete foundations): drill, 5/8" drill
bit
o
For ledger board: drill and
5/8”
concrete drill bit (masonry walls), or
1/2”
drill bit (wood
frame walls)
o
For all kits using post bases on concrete: drill;
5/8”
masonry drill bit; and
15/16”
wrench
o
For Pressure Treated Pine kits using post bases on concrete: you will also need a 5/32"
masonry drill bit, and a #2 Philips bit or #2 Philips screw driver
Kit Components