PARTS LIST
TOOLS REQUIRED
ASSEMBLY INSTRUCTIONS
• 10 mm socket or adjustable wrench
• 8 mm socket or adjustable wrench
• 10 mm nut driver, socket or
combination wrench
7
9
8
5
1
2
6
3
13
14
4
10
11
12
1.
Assemble locking casters (#10) into
uprights (#2).
2.
With the lower shelf ridges facing
outwards, assemble center panel (#3), onto
uprights (#2), making sure that the top of the
center panel (#3) is flush with top of uprights
(#2) with bolts (#10), nuts (#11) and washers
(#12), using washers on both ends of bolt.
Assemble bolts only finger tight.
3.
Slide signs (#14) into slots on top shelf (#6).
Assemble end panels (#1) onto assembled
center section of kart with bolts (#9 and #8),
nuts (#11) and washers (#12), using washers
on both ends of bolt. The two holes on one
end of the end panel (#1) to top shelf (#6) and
the 3 holes on the opposite end of the end
panels (#1) correspond with the 3 holes in the
lower part of the uprights (#2) and use bolts
(#9). Assemble bolts only finger tight.
4.
Tighten all nuts and bolts.
5.
Install lower shelves (#4) onto assembled
kart.
6. *FOR TOOL KART ASSORTMENT*
Install shelves (#5) into following slots
(counting down from top slot)
Side 1:
Side 2:
• Shelf 1 = Slot 8
• Shelf 1 = Slot 8
• Shelf 2 = Slot 12
• Shelf 2 = Slot 18
• Shelf 3 = Slot 18
No. Description
Qty.
1
End Panels
2
2 Uprights
2
3
Center Panel
1
4
Bottom Shelf
2
No. Description
Qty.
5 Shelves
7
6
Top Shelf
1
7
Top Sign Holder
1
8
6mm x 1.0 x 25mm Bolts
4
No. Description
Qty.
9
6mm x 1.0 x 65mm Bolts 16
10
Locking Casters 1
11
6mm x 1 Nut 20
12
6mm Flat Washer 40
No. Description
Qty.
13
Top Sign 2
14
Top Shelf Sign 2