ASSEMBLY INSTRUCTIONS
NOTE: All fasteners should be only "hand tight" until step 11.
1. Attach Front Legs (2) to Frame Base (1) using all four Frame Pins (24) as follows:
On each leg, insert one pin through Frame Base and Front Leg at rear hole #1 (See figures 1 & 2). This pin serves as
a pivot pin and remains in hole #1 permanently. Insert a second pin through the Frame Base and Front Leg at forward
hole #2. This serves as a Lock Pin to lock leg in down position (Figure 2).
2. Insert Hair Pins through Frame Pins to secure in place.
3. Attach Main Support Post (9) to Frame Base using bolts (19) and nuts (23).
4. Attach Support Straps (5) to top of Main Support Post using bolt (14) and nut (22).
5. Connect Support Straps to Frame Base using bolts (18) and nuts (23).
6. Connect bottom of Hydraulic Ram (6) to Main Support Post using bolt (16) and nut (22).
7. Connect Boom (3) to Main Support Post using bolt (13) and nut (21).
8. While helper holds Boom up, connect top of Hydraulic Ram to Boom using bolt (17) and nut (22).
9. Slide Boom Extension (4) into Boom making sure that slot for chain & hook faces down. Secure at desired capacity
position with bolt (15) and nut (22).
10. Install Chain & Hook Assembly (8) with bolt (20) and nut (23).
11. Tighten all fasteners.
1 Frame Base
1
6 8 Ton Hydraulic Ram
1
7 Pump Handle
1
2 Front Leg
2
3 Boom
1
4 Boom Extension
1
5 Support Strap
2
8 Hook & Chain Assembly 1
9 Main Support Post
1
Hardware Box
# Description
Qty.
Hardware Box Contents
Carton 2 Contents
Carton 1 Contents
13 Bolt M18 x 110
1
14 Bolt M16 x 120
1
15 Bolt M16 x 90
1
16 Bolt M16 x 85
1
17 Bolt M16 x 70
1
18 Bolt M14 x 110
2
19 Bolt M14 x 100
2
20 Bolt M14 x 80
1
21 Nut M18
1
22 Nut M16
4
23 Nut M14
5
24 Frame Pin w/Hair Pin
4
ASSEMBLY DIAGRAM
Figure 1
4