5
STEP 1:
PREPARE THE WINDOW
Lower sash must open sufficiently to allow a clear
vertical opening (H) of the following size. (See Table
1 on previous page.) Side louvers and the rear of the
AC must have clear air space to allow enough
airflow through the condenser for heat removal.
The rear of the unit must be outdoors, not inside a
building or garage.
MOUNTING HARDWARE:
3/4" (or 1/2")
Screws (7 pcs)
Lock Frame
(2 pcs)
Sash Lock
(1 pc)
Window
Sash Seal
Foam (1 pc)
Weather Stripping
10"x
3
/
4
"x
1
/
12
"
(5 pcs)
STEP 2:
PREPARE AIR CONDITIONER
A.
Remove the air conditioner from the carton and
place on a flat surface.
NOTE:
The top rail hardware and Fig. A, Fig. B, and
Fig. C are not applicable to the units 10,000 BTU/h or
greater. For models less than 10,000 BTU/h, the top
rail must be assembled.
B.
Remove top rail and insulation panels from the
rear of the packaging material as shown in Fig. A.
(Energy Star rated units only.)
TOP RAIL HARDWARE:
3/8" Screws
(4 pcs)
Top Rail
(1 pc)
Insulation
Panels (2 pcs)
C.
Align the hole in the top rail with those in the top of
the unit as shown in Fig. B.
D.
Secure the top rail to the unit with the 3/8″ screws
as shown in Fig. C.
STEP 3:
INSTALL THE ACCORDION PANELS
NOTE:
Top rail and accordion panels on each side
are offset to provide the proper pitch of 5/16″ to the
rear. This is necessary for proper condensed water
utilization and drainage. If you are not using the
accordion panels for any reason, this pitch to the rear
must be maintained.
B
. Slide the free end “ ” section of the panel directly
into the cabinet as shown in Fig. 2. Slide the
panel down. Be sure to leave enough space to slip
the top and bottom of the frame into the rails on
the cabinet.
" "
FIG. A
Packaging
Top Rail
Insulation Panels
(for <10,000 Btu/h
models only)
Insulation Panels
(for ≥10,000 Btu/h
models only)
FIG. B
FIG. C
FIG. 1
FIG. 2
A.
Place unit on floor, a
bench or a table. Hold the
accordion panel in one hand
and gently pull back the
center to fill the open end.
See Fig.1.