background image

Ground Fixed 

Freechimes  

Alto/ Soprano 

Page 1 of  3 

Components: 

1

Carefully lay 2 x legs 

on a 

level surface 

and check 

distance between 

legs is 

equal

. Line up pre drilled holes 

in the backboards with the 
legs and ensure the 
instrument is aligned square 
with the legs. 

Fix 

in place 

using 

6x80mm

 

screw

supplied (see installation 
guide) 

 
 

 

2

.

Excavate 2

 

holes

 on site of 

installation approximately  

600mm

 

deep

 ( adjust depth 

according to age range for 
intended players) 
 
 
 

 

 

3

Carefully raise 

the 

instrument

 from the ground 

with legs attached 

and locate 

(lower) legs 

into

 

holes

 making 

sure they are vertical and level 
prior to concreting in place. 
(See Ground Fix Sheet) 
 
 
 
 

Installation Instructions 

4

. Once happy with location 

and levels, 

fill 

holes using 

rapid hardening 

concrete

. Be 

sure to compact concrete 
around legs and leave to dry 
according to manufactures 
guidelines 
 
 
 

 

 

5

. Beaters can be fixed to  

wooded posts with fixings 
provided 
 
 
 

 

 

KS1,2, 

  

KS1 – 700mm 
KS2 – 850mm 

 

 

Ground Surface

  

Pair Small  

Beaters X1 

28-32 Kg 

BS EN 1176

  

1.5m

  

Weight of heaviest part 

9.6kg

 (Wooden Posts Each) 

 

1.5m

  

600mm 

  

Install Instrument 
with 1.5m free space 
(from widest point) 
around it.

  

10x38mm 

Secure Screw 

X4 

Eye Straps 

X2 

6x80/50 

Screw X4 

Metric Conversion: 
600mm/ 24” 
700mm/ 28” 
850mm/ 33” 
1.5m/ 59” 

Spares available form  

percussionplay.com 

or from your 

local distributor 

Отзывы: