ST-02 Speed gate and STD-02 Double-sided section
35
8.7.4 Installation and dismantling of the central insert
Follow these steps in order to mount the central insert:
1. Take the central insert from the delivery set, mount it into place, while observing the location of
its grooves in accordance with the location of the sliding panels.
2. Screw in the two M4×8 screws (see Fig. 22) with the washers by using PH2 Phillips
screwdriver (installed by default).
Dismantling of the central insert needs to be done in the reverse order.
Figure 22. Installation of a central insert
Содержание ST-02 Series
Страница 1: ...CERTIFICATE ST 02 Speed Gate STD 02 and Double Sided Section ...
Страница 2: ...ST 02 Speed gate and STD 02 Double sided section Assembly and Operation Manual ...
Страница 31: ...Assembly and Operation Manual 30 Figure 17 Speed gate wiring diagram ...
Страница 49: ...www perco com ...