background image

perco.com                  linkedin.com/mwlite/company/perco                   [email protected]                  +7 (812) 247-04-64

   

A13

Walkway downlights power supply (+12 V / 3 A)
Walkway downlights

LED

Indication blocks of passage directions A and B

RA, RB

ACS readers

1, 2

Indication cables

3

Passage zones power cables

4

External cable for powering walkway downlights

5

Jumpers for switching "IMP/POT" mode

6

Fire Alarm jumpers are connected if there is no Fire Alarm device (A7)

DIN-rail description

Contact

Electrical circuit

Designation

1, 2

+24 V, GND

Power supply connection

3-5

+12 V, Detector, GND Intrusion detector connection

6, 7

Fire Alarm, GND

Emergency unlocking input

8

RC Sound

RC-panel sound indication output

9-11

UnlockA, Stop, 

UnlockB

Turnstile control inputs

12-14

RS LedA, 

RS LedStop, 

RS LedB

RC-panel indication outputs

15, 16

IMP / POT

Turnstile control mode setting

17

+12 V

Output for powering additional devices

18, 19

Alarm 1, Alarm 2

Siren connection outputs

20

Common

Common contact for PASS A, PASS B, Ready, Det Out signals

21

PASS A

PASS A relay contact (passage in the direction A)

22

PASS B

PASS B relay contact (passage in the direction B)

23

Ready

Ready relay contact

24

Det Out

Det Out relay contact

25-30

NO, Light, NC

Relay contacts for connecting remote indicators

31-36

+12 V, LED, GND

Contacts for connecting indication blocks located on the guide 

barrier set

37, 38

U1, U2

Connection of the walkway downlights power supply

Operation 

algorithm

Each passage zone can operate from the RC-panel (included in the delivery set), WRC or 

ACS controller. Operation is performed by applying a low-level signal to unlock A, Stop and 

Unlock B contacts relative to the GND contact. Response to these signals depends on the 

control mode the user has selected (specified by if the IMP/POT jumper wire is installed / 

removed on the DIN-rail of the passage zone).
Pulse control mode is when a pulse is applied to the Unlock A (B) input, the passage zone 

rotor will automatically unlock for a single passage in the direction A (B). The waiting time for 

the passage being completed does not depend on the duration of the control pulse and lasts 

5 seconds. Sending a pulse to the Stop input locks the rotor in both passage directions.
Simultaneous sending of pulses to the Unlock A (B) and Stop inputs places the passage zone 

in the "Free passage" mode in the selected direction.
It is recommended to use pulse mode during operation from RC-panel or WRC. The 

orientation of RC-panel buttons can be changed by swapping the wires from the RC-panel 

that are connected to the unlock A and Unlock B contacts, as well as Led A and Led B, 

respectively.
Potential control mode is when the control signal is applied to the Unlock A (B) input, the 

passage zone rotor unlocks in the selected direction during the entire holding signal time. 

RTD-20 Full height rotor turnstile

Содержание RTD-20

Страница 1: ...It is recommended to install one turnstile based on a maximum working load of 20 persons min Turnstiles can be equipped with a matching gate and railings Each passage zone provides passage control in two directions operating mode may be set independently for each passage direction of both passage zones Supported operating modes passage denial in both directions single passage in one direction and ...

Страница 2: ...pped with a stainless steel rotor two control modes pulse and potential possibility to connect an intrusion detector and a siren to the turnstile The turnstile with regard to resistance to environmental exposure complies with GOST 15150 69 category N2 operation outdoors The operation of the turnstile is allowed at ambient temperature from 40 C to 55 C and relative air humidity up to 98 at 25 C Top...

Страница 3: ...TD 20 1 max 105 W Power consumption current for each turnstile RTD 20 2 30 W walkway downlights 10 W Throughput rate for each passage lane in the single passage mode 20 persons min in the free passage mode 30 persons min Overall dimensions without canopy 2480х1595х2303 mm with RTC 20 canopy 2485х1840х2558 mm Turnstile weight RTD 20 1 max 370 kg RTD 20 2 max 375 kg Width of each passage zone 630 mm...

Страница 4: ...STOP UNLOCK B A5 1 A5 2 ACS 1 ACS 2 OUT A13 7 8 9 10 11 GND RS SOUND UNLOCK A STOP UNLOCK B 7 8 9 10 11 XP1 XP19 DIN RAIL 7 8 9 10 11 GND RS SOUND UNLOCK A STOP UNLOCK B 7 8 9 10 11 XP1 XP19 DIN RAIL 17 12V 17 LED A 1 RIDER A 1 ACS 1 1 2 1 2 7 20 21 22 23 24 COMMON PASS A PASS B READY DET OUT PASS A PASS B READY DETECTOR COMMON BLUE BLACK BLUE RED RED BLACK 31 32 33 34 35 36 25 26 27 28 29 30 NO A...

Страница 5: ...cated on the guide barrier set 37 38 U1 U2 Connection of the walkway downlights power supply Operation algorithm Each passage zone can operate from the RC panel included in the delivery set WRC or ACS controller Operation is performed by applying a low level signal to unlock A Stop and Unlock B contacts relative to the GND contact Response to these signals depends on the control mode the user has ...

Страница 6: ... allowed cable length of the RC panel ACS controller is 40 meters The maximum allowed cable length of the power supply depends on its cross section and must be for 1 5 mm cable 10 meters for 2 5 mm cable 20 meters Example of connection to the ACS Example of one passage zone connection to the ACS controller CT L04 2 XT6 XT7 XT2 XT1 XT5 S1 XT4 OUT1 OUT2 IN RC RS 485 TCP IP 12V NO1 С1 NС1 NO2 С2 NС2 ...

Страница 7: ...on a less steady foundation it is recommended to apply reinforcing elements 500х500х500 mm or RF 20 foundation frame When using the foundation frame hole marking and anchors are not required in this case the turnstile mounting is more secure Hole marking cable duct for cable laying turnstile with security gate and railing section mounting layouts are shown in Figures 2 holes ø25x100 24 holes ø16x6...

Страница 8: ...rnstile and WHD 16 security gate Flanges of RTD 20 guide barrier sections Flanges of WHD 16 security gate 4 holes ø16x60 Hole marking for mounting turnstile and MB 16 security gate HDF marking template is provided for easier marking It is recommended to place ACS readers on the guide barrier sets near the indication blocks Lock chamber mode is arranged during the installation the home position of ...

Страница 9: ...made of galvanized sheet steel Frameworks 1 2 3 5 Mounting hardware set 1 Installation instruction 1 Overall dimensions length x width x height 2548х1536х65 mm Weight max 50 kg Mounting Assembled frame is installed on prepared foundation sized 2800х1700 mm and 200 250 mm deep is levelled with included in the delivery set pins and reinforcement wires Cable channels are to laid cable channel is allo...

Страница 10: ...re similar to the requirements for the turnstile mounting The symmetry axes of the turnstile mounting holes are the same Flanges and holes for RTD 20 turnstile mounting 4 holes ø16x60 Symmetry axis of mounting holes for RTD 20 and RTC 20 Hole marking for canopy mounting Warranty The warranty period is 5 five years commencing from the date of sale unless otherwise determined in the delivery contrac...

Отзывы:

Похожие инструкции для RTD-20