6  MARKING AND PACKAGING 

The turnstile has the following marking: 

  on the turnstile post – a label located on the underside of the flange; 

  on the control unit – a label located on the rear panel of the control unit. 

The turnstile in the delivery set (see Chapter 0) is packed into the shipping box, which keeps it 

undamaged during the transportation and storage. 
The shipping box dimensions are (length × width × height) ...................................... 108×66×26 mm 
The shipping box has the serial number marking and the additional marking in accordance with the 

design documentation and the delivery set.  

7  SAFETY REQUIREMENTS 

7.1  Installation safety requirements 

Installation should be performed by qualified personnel only, in strict accordance with the Manual 

and general electrical safety requirements for electrical and installation work. 

 

Attention! 

  Only serviceable tools should be used. 

  All the connections should be performed only after the CU is disconnected from the 

power supply. 

  Cables should be laid in accordance with electrical safety requirements. 

  The turnstile is heavy, hold it to prevent the fall! 

7.2  Operation safety requirements 

Observe general safety requirements for use of electrical equipment. 

 

Don'ts! 

  Do not use the turnstile under conditions that do not comply with the requirements of 

Chapter 2 of this Manual; 

  Do not mount the control unit on the current-conducting surfaces or install in wet 

premises; 

  Do not open the CU cover prior to the power supply switching off; 

  Do not replace the fuses prior to the CU power supply switching off. 

The turnstile operates within voltage range from 198V AC to 242V AC only. In case of the voltage 

jump, exceeding the operating voltages, use a voltage stabilizer. 

8  INSTALLATION INSTRUCTIONS 

8.1  General Recommendations 

It is recommended:

 

  to mount the turnstile on steady and level concrete (grade 400 or higher, strength group 

V22.5), stone or similar foundations at least 150mm thick; 

  to level the foundation so that the anchoring points of the turnstile post lie in the same 

plane; 

  to apply reinforcing elements (300×300×300mm) for installation on less steady foundation; 

  to mark the mounting holes according to the enclosed installation instructions (see Fig.7); 

  to control the vertical position of the turnstile post during installation. 

8.2  Tools and equipment required for installation 

  1.2–1.5 kW hammer drill; 

  Ø14 mm hard-alloyed drill for anchor bolts; 

  Ø 5 hard-alloyed drill for CU; 

  Wall chaser for laying the cable; 

 

Phillips head screwdriver №2;

 

Содержание RTD-03S

Страница 1: ...OPERATION MANUAL RTD 03S Waist high Rotor Turnstile...

Страница 2: ...Waist high Rotor Turnstile RTD 03S Operation manual...

Страница 3: ...anical unblocking of the turnstile 11 6 MARKING AND PACKAGING 12 7 SAFETY REQUIREMENTS 12 7 1 Installation safety requirements 12 7 2 Operation safety requirements 12 8 INSTALLATION INSTRUCTIONS 12 8...

Страница 4: ...egory U4 operation in premises with climate control Operation of the turnstile post is allowed at ambient temperature between 1 C and 45 C and relative air humidity up to 98 at 35 C The control unit i...

Страница 5: ...ppendix 1 Wireless remote control kit 1 Note Wireless remote control kit consists of a receiver and 2 transmitters tags with operation range up to 40 m 5 BRIEF DESCRIPTION 5 1 Main features The turnst...

Страница 6: ...1 Four barrier wings 6 are mounted on the rotary post 1 The filler panels 7 are set into the barrier wings 6 with the fastenings 15 On the rotary post 1 cover 3 there is the mechanical release lock 4...

Страница 7: ...panel which are intended for setting the turnstile operating modes The LED indicators are located above the buttons The button in the middle hereinafter the STOP button is intended to set the turnstil...

Страница 8: ...RTD 03S Waist high rotor turnstile 7 Figure 3 Control unit...

Страница 9: ...cable connector Control Power cable connector DC 24V External DC power supply connector Bat 24V AC power cable input 220V Entry for intrusion detector and siren cables Alarm Connections for intrusion...

Страница 10: ...he X5 connector of the processor module see Fig 9 If the jumper is fixed pulse control the jumper is not fixed potential control The control unit is supplied with pulse control mode preset the jumper...

Страница 11: ...Pass Sensor Pwr failure and Bat failure have the galvanic decoupling a Control elements of an external device a normally open relay contact b Control elements of an external device a circuit with ope...

Страница 12: ...locking of the turnstile Possibility to unblock the turnstile manually is specially provided for unblocking the turnstile in the emergency mode at all the power supplies failure AC mains switching off...

Страница 13: ...l safety requirements for use of electrical equipment Don ts Do not use the turnstile under conditions that do not comply with the requirements of Chapter 2 of this Manual Do not mount the control uni...

Страница 14: ...raceways for the control cable 10 and the power cable 11 as shown in Fig 7 and according to your checkpoint layout Figure 7 Marking layout for RTD 03S installation dotted line shows the dimensions of...

Страница 15: ...ttings 14 holes Check the strong fastening of the barrier wings 6 and the filler panels 7 8 Check free rotation of the rotary post 1 Unblock the rotary post with the mechanical release key 5 see Claus...

Страница 16: ...ector put remote control cable 13 through its cable inlet inside the control unit and connect it to the X3 and X4 connectors on the processor module as per Fig 9 11 Set the CU Power toggle switch and...

Страница 17: ...s and the AC power cable operability Prior to the turnstile power up set the Power toggle switch and the Battery toggle switch to the O position Install the Bat 2A fuse which is provided together with...

Страница 18: ...nd for the new passage mode entered by the RC will be enquired in the command queue of the turnstile After the barrier wing is reset to the reset state the command from the command queue will be perfo...

Страница 19: ...Grn_L or LED Grn_R output is active depending on the set direction The barrier wings rotation in the set direction is allowed 3 Bidirectional single passage open for one by one person passage in each...

Страница 20: ...will start blinking with interval of 2 seconds At the further battery discharge the CU will automatically switch off When the AC mains is restored the turnstile turns to the AC mains the Power toggle...

Страница 21: ...e and when the CU is powered up with the external SPS via the Bat 24V connector the Battery toggle switch is in the I position the Bat 2A fuse is not installed the turnstile does not work the indicato...

Страница 22: ...Guide barriers set posts polished tubular stainless steel dia 50 mm rails beechwood ashwood filler panels tinted polycarbonate plastic mnemonic indication units RB 03S guide barriers set Guide barrier...

Страница 23: ...r stainless steel dia 50 mm rails polished tubular stainless steel dia 32 mm filler panels tinted polycarbonate plastic symbol indication units RB 03T guide barriers set Guide barriers set posts polis...

Страница 24: ...ut for installation of turnstile with guide barriers set electric raceway to the control unit is laid from the turnstile post center in the direction of the control unit according to the layout Figure...

Страница 25: ...PERCo Polytechnicheskaya str 4 block 2 194021 Saint Petersburg Russia Tel 7 812 247 04 64 E mail export perco com support perco com www perco com...

Страница 26: ...www perco com...

Отзывы: