10.
Replace floorboards, engine cover and helmsmans seat. The engine is now ready
for starting.
1
2
Fig.
1 7 . fuel injection pump and fuel filter.
1.
2.
Bleed screws
3. Manual pump
4.
Cold start button
Bleed screw for fuel filter
I
4
I
3
Rubber bushing
Oilpocket
Rubberhose
Fig.
18.
Propeller shaft sealing and bearing.
Starting
1.
2.
3.
Check that the cooling water seacock is open.
Check that the stop control is pushed in (fig. 19).
Disengage the control lever with the disengaging latch (fig. 19) and move the
control lever ahead to the starting position (position 7 in fig. 21).
Insert the starting key and turn it to position 1 in fig. 22.
Check that the yellow warning light for oil pressure and the red warning light for
charging are on.
Push the starter switch key and turn clockwise to position
2 in fig. 22. Hold the
key there until the engine starts. The key when released will return to the switched
on position (position 1 in fig. 22).
4.
5.
6.
12
www.jonesboatyard.co.uk