
In Service
(Primary Tank)
Standby
1
2
3
4
In Service
1
2
3
4
Standby
First Trip Point
(Primary Valve)
Total Flow Split
Between Two Meters
Standby
Flow Rate Demand
Below First Trip Point
(Primary Valve)
1
2
3
4
Standby
Flow Split Between
Three Meters
1
2
3
4
Standby
Flow Split Between
Two Meters
1
2
3
4
Full Capacity
4th in Standby
(Primary Valve)
3/4 Capacity
3rd in Standby
1
2
3
4
1/2 Capacity
2nd in Standby
1/4 Capacity
1st in Standby
Full Capacity
4th in Standby
3/4 Capacity
3rd in Standby
1
2
3
4
1/2 Capacity
First Trip Point
Programmed Rate
1/4 Capacity
Ne Primary Tan
System Operation in Regeneration:
Содержание FLECK 3200 NXT
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ...WARNING CONTINUED...
Страница 5: ......
Страница 8: ......
Страница 15: ...CONTINUED...
Страница 17: ...CONTINUED...
Страница 18: ...6 5 3 4 2 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20...
Страница 19: ...CONTINUED...
Страница 20: ...6 7 1 3 4 2 10 9 11 12 8 5 5...
Страница 21: ...5 6 1 12 11 8 9 10 5 4 3 7 2...
Страница 22: ...1 7 15 16 13 3 2 5 4 6 8 11 12 9 10 14 12 16 13 14 1 3 2 5 4 6 8 9 7 17...
Страница 23: ...13 2 1 7 11 8 9 5 6 4 10 12 3 3 3 9 11 14...
Страница 31: ...WARNING...
Страница 32: ......