background image

JUNG-PUMPEN.DE  

B 48216-20-1808

EN   Instruction Manual

 

BAUFIX 200

Содержание BAUFIX 200 series

Страница 1: ...JUNG PUMPEN DE B 48216 20 1808 EN Instruction Manual BAUFIX 200...

Страница 2: ...2 Baufix 200 32 Baufix 200 50...

Страница 3: ...3...

Страница 4: ...arding this information can be dangerous General danger to people Warning of electrical voltage NOTICE Danger to equipment and operation Qualification and training of personnel All personnel involved...

Страница 5: ...tially at an angle and then press the remainder in The air should audibly es cape from the seal and the cover frame should be securely in place After assembling the frame check that the seal is correc...

Страница 6: ...hrough the vent pipe and sealed in the same way as the pump cable The alarm unit should be connected to a separate elec tric circuit to ensure the operation in case of a pump fault Al ternatively it c...

Страница 7: ...707 Abdeckplatte Cover JP48245 Abdeckrahmen Frame JP48244 Dichtprofil Profiled joint JP47394 Druckleitung Pressure pipe JP48739 Gummi Winkel Rubber elbow JP48460 R ckschlagklappe Reflux valve JP48716...

Страница 8: ...PUMPEN BAUFIX 200 40 JP09991 BAUFIX 200 50 JP44989 Pre July 2017 Abdeckplatte Cover JP48245 Abdeckrahmen Frame JP48244 Dichtprofil Profiled joint JP47394 Anschluss Set Connecting kit Baufix 200 40 JP...

Страница 9: ...9...

Страница 10: ...arks of Pentair or its subsidiaries in the United States and or other countries 2018 Pentair Jung Pumpen Pump Technical Services Limited Pump House Unit 12 Bilton Road Industrial Estate Erith Kent DA8...

Отзывы: