
INSTALLATION INSTRUCTIONS
17
3.2 Unpacking
■
The materials (cardboard) used for packing the
appliance are fully recyclable.
■
It is recommended that the packing material is only
removed prior to installing the boiler. The manufacturer
will not be held responsible for damage caused by
incorrect storage of the product.
■
Packing materials (plastic bags, polystyrene, nails, etc.)
must not be left within reach of children, in that these
items represent a potential hazard.
A.
Place the packed appliance on the floor (see fig. 1) making
sure that the "up” arrow is facing down. Remove the staples
and open out the four flaps of the box.
B.
Rotate the boiler 90° while manually supporting it from
underneath
C.
Lift the box and remove the protections. Lift the boiler by
grasping the rear part and proceed with the installation.
STORAGE & HANDLING
Please note that prior to installation the Pensotti North America
boilers should be stored in the horizontal position with no more
than three boilers to a stack;
Ensure that the boilers are stored in dry conditions and be
aware that the carton is a two-man lift;
B
C
A
Fig 1
Содержание PCI 20-H
Страница 8: ...GENERAL INFORMATION 5 ...
Страница 9: ...GENERALInformation 6 ING ...
Страница 10: ...GENERALInformation 7 ...
Страница 11: ...GENERALInformation 8 ...
Страница 33: ...INSTALLATION INSTRUCTIONS 29 Venting Pictures Illustrations ...
Страница 34: ...INSTALLATION INSTRUCTIONS 30 Included With Each Combination Boiler Is A PAHVK Horizontal Kit ...
Страница 38: ...INSTALLATION INSTRUCTIONS 34 ...
Страница 39: ...INSTALLATION INSTRUCTIONS 35 Follow all venting manufacturers guidelines for low profile terminations ...
Страница 73: ...69 6 13 Sequence of Operations ...
Страница 74: ......
Страница 75: ...Pensotti LLC 34 Coffin Ave Brewer ME 04412 P 207 942 3636 F 207 942 3737 www pensottiboiler com ...