background image

 

   

 

Installation Instructions  P47 

 

 

Issue Date  0918 

©  2018 Johnson Controls 

1

 

  Form 997-455, Rev. D 

P47 Series 

Steam Pressure Limit Controls 

 

Application 

The P47 controls are designed 
for high limit, cutout, or operating 
control applications. When used 
as a limit or cutout control, the 
P47 is intended primarily to limit 
the pressures in steam heating 
systems. 

The controls which OPEN on a 
pressure increase are for use on 
high limit, cutout, or operating 
applications. 

The controls which CLOSE on a 
pressure increase are typically 
used to deenergize a unit heater 
blower when the steam pressure 
is below that required for 
adequate heating. 

The 4-wire, two-circuit models 
(P47GA) have two separate sets 
of contacts. The main load 
contacts (LINE-M2) open on 
pressure increase and 
simultaneously the auxiliary 
circuit (LINE-M1) closes. These 
models may be used to limit 
steam pressures and energize 
an alarm indicator. 

The SPDT models (EA and FA) 
may be used on open high or 
close high applications, and may 
also be used to control 3-wire, 
two position valves or dampers. 

The controls with the lockout 
feature require manual reset to 
reclose the circuit and can only 
be reset after the pressure 
normalizes. The reset is “trip-
free” and will not permit restart 
until the reset lever has been 
pushed and released. 

The P47 controls may also be 
used for air and non-combustible 
gas or liquid applications which are 
not harmful to iron, copper, or 
brass. Do not install where 
ambient temperature exceeds 
140°F (60°C) or falls below -30°F 
(-34°C). 

!

 CAUTION: 

Risk of 

equipment damage. 

Never 

exceed the maximum 
overpressure for the control. 
Refer to the table below to 
determine the maximum 
overpressure. 

Control Range 
psig (kPA) 

Maximum 
Overpressure 
psig (kPa) 

0 to 15 
(1 to 100) 

50 
(345) 

20” Hg. Vac. to 50 
(-70 to 350) 

180 
(1240) 

0 to 150 
(0 to 1000) 

300 
(2069) 

50 to 240 
(500 to 1500) 

300 
(2069) 

175 to 425 
(1200 to 2930) 

540 
(3720) 

 

Installation 

Mounting 

1.  Mount the control to the 

boiler tap above the water 
level. Be sure there is no 
shutoff between the control 
and the boiler. (Usually there 
is a tap for mounting the 
control and/or a pressure 
gauge on top of the boiler.) 

2.  Connect the siphon (when 

required) between the boiler 
and the control so live steam 
does not enter the bellows 
corrugation. (A siphon is not 
supplied as standard with 0 to 
15 psig [0 to 103 kPa] range 
controls.) 

3.  The P47 control must be 

mounted to a tap separate 
from the pressure gauge or 
other devices. Refer to Fig. 2 
for typical P47 mounting. 

 

4.  If the control is not mounted 

on the boiler, anchor the 
control by two mounting holes 
in the back of the case using 
the screws supplied. Make 
certain the connecting pipes 
to the boiler are installed at a 
slight angle to permit 
condensate to drain through 
the siphon back into the 
boiler. 

5.  Put a small amount of pipe 

dope or thread sealing tape 
on the male threads. 

6.  To tighten the pressure 

connection, use a wrench on 
the hexagonal flats of the 
bellows pressure connector. 

IMPORTANT: Do not tighten the 

connection by grasping the 
control case and turning. 
Never use a pipe wrench on 
the bellows cup. 

 

Fig. 1 -- Interior view of two-

pole pressure control with 

manual reset  

Отзывы: