
R
R
F
F
-
-
8
8
0
0
0
0
0
0
E
E
M
M
i
i
c
c
r
r
o
o
w
w
a
a
v
v
e
e
R
R
F
F
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
— Chapter 4. Mounting the RF-8000E
RF-8000E Operations Manual
52
Figure 27, Example of Wall Mounting RF Repeaters. Note the use of rigid W/G bends and twists.
Mounting Associated Equipment and Space Planning
Mount the site power system and any other associated equipment before mounting and wiring the
repeater. Plan the site equipment layout prior to beginning installation.
Recommended power system installation sequence:
1. Ground Ring or grounding provision
2. Battery Enclosures and Batteries
3. Photovoltaic Array, mounting frame and modules
4. Wind Turbine Generator, pipe mount and generator
5. PV Array Combiners
6. PV
Controller