
Final Assembly
Take one of the drive trains and fit its wheelsets into position. If you are using a
Heljan drive unit, replace the undertray.
Using a pair of tweezers to handle the
springs, and a small screwdriver to
manipulate the bearing carriers, thread one
of the primary springs through one of the
holes in the ears of the central bearing
carrier.
Thread the spring through the slots in
the ears of the bearing carrier of the
outer axle.
Thread a second spring through the
hole in the other ear of the central
bearing carrier.
Final Assembly
49/52
(c) PenBits Model Railways, All Rights Reserved
04/05/2017