 SETTING AND FASTENING THE WINDOW

A.  Install and level sill spacers. Place 1" wide by 1/4" thick spacers 

on the bottom of the window opening 1/4" from each side. 

Spacers are also required at transition bars in multiple sash units. 

Add shims as necessary to ensure the spacers are level. Once level, 

attach spacers and shims to prevent movement.
Note:  Improper placement of shims or spacers may result in 

bowing the bottom of the window.

B.  Remove plastic wrap and cardboard packaging from window. 

DO NOT open the window until it is fully fastened.
Note:  For best results, install the window with the sash 

closed and locked with the shipping spacers in place.

  TWO OR MORE PEOPLE WILL BE 

REQUIRED FOR THE FOLLOWING 

STEPS.

Note:  If fins are to be installed to no fin 

units, go to the Applying Installation Fin 

instructions on the back before proceeding 

to step C.

C.  Insert the window from the exterior of the 

building. Place the bottom of the window on the spacers 

at the bottom of the opening, then tilt the top into 

position. Center the window between the sides of the 

opening to allow clearance for shimming and insert one 

roofing nail in the first hole from the corner on each end 

of the top nailing fin. These are used to hold the window 

in place while shimming it plumb and square.

D. Plumb and square window. Place shims 1" from the 

bottom and top of the window between the window and 

the sides of the opening. Adjust the shims as required 

to plumb and square the window in the opening. If the 

frame height exceeds 53", place shims at the quarter 

points of the window sides.
Note:  DO NOT shim above the window or in the 

space between the spacers at the bottom of the window. 

DO NOT over shim.

E.  Check the interior reveal. Make sure the 

measurement from the interior face of the 

window to the interior face of the wall is 

equal at several points around the window.

F.  Fasten the window to opening by driving 2” 

galvanized roofing nails into each prepunched 

hole in the nailing fin. 

G. Check the window operation. Remove the plastic 

spacers located between the bottom of the vent panel and 

the frame sill. Open and close the window a few times to 

check for proper operation. Close and lock the window.
Note:  If there are any problems with the operations 

of the window, recheck shim locations and adjust for 

plumb and square.

2A

2C

Interior View

2D

2D

2E

1

2 0 3 0 40

5 0 6 0 70

2

3

INCHES

mm

2E

Содержание 802Q0101

Страница 1: ...d Warranty is part of the terms of the sale Failure to comply with all Pella Impervia installation and maintenance instructions may void your Pella Impervia product warranty See Limited Warranty for c...

Страница 2: ...g 12 longer than the opening width Apply at the bottom of the opening as shown so it overhangs 1 to the exterior Note The tape is cut 12 longer than the width of the opening so that it will extend up...

Страница 3: ...shimming and insert one roofing nail in the first hole from the corner on each end of the top nailing fin These are used to hold the window in place while shimming it plumb and square D Plumb and squ...

Страница 4: ...corners of the window Note Be sure to overlap the top corners 4 INTERIOR SEAL Caution Ensure use of low pressure polyurethane window and door insulating foams and strictly follow the foam manufacturer...

Страница 5: ...go This should provide at least a 1 4 clearance between the backer rod and the exterior face of the window Note Backer rod adds shape and depth for the sealant line B Apply a bead of high quality exte...

Страница 6: ...to the top of the frame jamb grooves located on the side frame members of the window Slide the fins into place Note The side fins must overlap the exterior of the bottom fin C Install and slide the pr...

Страница 7: ...ts in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems The determination of the...

Отзывы: