5
WWW.HOMEDEPOT.COM/PEGASUS
Please contact 1-877-580-5682 for further assistance.
Installation
1
Preparing for installation
□
It is recommended to install a wood backing
behind the wall as shown in the above diagram.
This backing offers support to the mounting
bracket as installed in steps 5 and 6.
2
Installing the supply piping
□
Install the supply piping so that the 1/2"
threaded connection protrudes approximately
1/2" beyond the finished wall.
CAUTION:
Always turn off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
wall finished
surface
wallboard
1x4 blocking
1x4 blocking
3/8"-1/2"