
4
1. Provide a sound, level foundation. Locate boiler as
near to the outside wall as possible and centralized
with respect to the heating system.
2. Locate boiler in front of installation position before
removing crate.
4. Separate the wood shipping pallet from the boiler
base by removing two (2) hold-down bolts at each
end of the boiler base.
5. Move boiler into final position.
BOILER SET-UP
2. BOILER SET-UP
Содержание PSC II
Страница 1: ...PSC II Boilers Series Gas Installation Operation Maintenance Manual...
Страница 14: ...12 Figure 4 3 Vertical Venting System VENTING VENTILATION AND AIR INLET...
Страница 24: ...22 START UP PROCEDURES Figure 7 3 Operating Instructions...
Страница 25: ...23 START UP PROCEDURES Figure 7 4 Operating Instructions...
Страница 34: ...32 MAINTENANCE Figure 9 2 Inspection of Flueways Burners and Vent System...
Страница 38: ...36 REPAIR PARTS Figure 11 2...