The inlet supply system must provide the pump with Net

 

Positive Suction Head (NPSH) equal to or greater than

 

that required by the pump at any capacity on its operating

 

curve. If you need assistance to calculate or measure

 

suction supply system NPSH, contact your Peerless

 

Pump representative.

Related information

4

.3.1 Seismic analysis

4

.4.4 Leveling preparations

4

.4.2 Foundation, grout and anchor bolt installation

4

.3

 

Foundation

Install the pump on a foundation rigid enough to support the weight

 

of the pump plus the fluid in the pump. Weak foundations or

 

foundations on unstable ground can cause misalignment, vibration,

 

and even foundation failure.

See standard engineering reference manuals for
allowable bearing loads of structural steel and floors.
Local building codes may recommend allowable bearing
loads for different soil types.

The mass of the foundation should be at least five times that of the
rotating element of the pumping equipment for a permanent and
rigid support for the base plate. Even then, it is possible the
foundation mass might not be adequate, so a civil engineer should
review and approve the steel support structure before pump
installation. Ensure proper foundation and base plate bolt sizing,
particularly on high-pressure pumps, to adequately restrain reaction
forces such as from directional flow change, system transients and
sudden valve closure. Concrete foundations may have anchor bolts
installed in sleeves that are two times the diameter of the bolt to
allow alignment and should be located by a drawing or template.

Ensure that a civil engineer reviews and approves a steel
support structure before pump installation.

Whether the base plate is installed prior to the pump installation or
at the same time, the pump must be attached to the base plate. To
avoid excessive vibration, ensure the pump feet are clean and free
of burrs and nicks. Follow the instructions in this manual for leveling
and grouting. After the grout cures (48 hours minimum), the pump
unit may be finished for pump installation. We do not recommend
installing the base plate without the pump.

Position the foundation and the foundation bolts so that
pump inlet and outlet flanges align with the outlet pipes.

Related information

4

.4.2 Foundation, grout and anchor bolt installation

4

.3.1

 

Seismic analysis

When the pump is located in a seismically active area or in certain

 

critical installations, ensure that the pumps, supports, and

 

accessories are earthquake-resistant. The design specifications for

 

earthquake resistance vary depending on the geographical area

 

and the class of the equipment. The class of the
equipment depends on defining how critical is the survival of the

 

equipment, the characteristics of the structure's response to

 

accelerations, and the foundation supporting the pump.

If a seismic analysis is required, please refer to the
governing bodies recommended for grouting and
foundation requirements. 

The customer must supply complete specifications for earthquake-
resistance requirements including seismic criteria, acceleration,
magnitudes, frequency spectrum, location and direction relative
to the pump and qualification procedure. 

Related information

4

.2 Location

4

.4 Installation preparations

4

.4.1

 

Pre-installation check

All pump parts are carefully inspected before leaving the factory but

 

may become soiled or damaged in shipping and handling or storage

 

at site. The installer must ensure that all parts are clean and

 

undamaged before installation.

Do not step or walk on the pump components. Do not
place other parts or equipment on the pump components.

Use appropriate solvent to wash off any protective coating from the

 

shaft sections and wipe thoroughly clean and dry. 
Dirt, sand, etc. in the system will cause premature wear on the

 

critical pump internal surfaces, resulting in reduced pump

 

performance.

4

.4.2

 

Foundation, grout and anchor bolt installation

1

2

3

4

5

6

7

8

11

9

10

TM054775

Fig.

Foundation, grout, and anchor bolt installation

Position

Description

1

Finished grouting

2

0.75-1.25 in (19-32 mm) allowance for grout

3

Formwork

4

Pipe sleeve

5

Washer

6

Base plate

7

0.2-0.4 in (5-10 mm)

8

Lug

9

Grout

10

Wedges or shims left in place

11

Top of foundation

Related information

4

.2 Location

4

.3 Foundation

 

4

.4.5 Grout material

 

4

.5.3 Installing grout

1

0

English (US)

Содержание PVF Series

Страница 1: ...PVF Vertical inline single stage pumps Installation operation and maintenance manual English Peerless_USLetter_Front_PVF IO fm Page 1 Friday September 13 2019 10 38 PM...

Страница 2: ...or wear caused by abrasive materials nor does it cover damage resulting from misuse accident neglect or from improper operation maintenance installation modification or adjustment This warranty does...

Страница 3: ...Before starting any work on the product make sure that the power supply has been switched off and that it cannot be accidentally switched on Never do maintenance work on the pump when it is connected...

Страница 4: ...Excessive noise Death or serious personal injury If the operating noise level of the product exceeds local code or safe levels over 85 dBA the product must be installed in a controlled access area Pr...

Страница 5: ...10 11 12 6 13 14 20 21 22 15 16 17 18 19 6 6 6 6 TM060290 Fig Pump nameplate Pos Description Pos Description 1 Product number 12 Description 2 Nominal flow 13 Description 3 Nominal pressure 14 Serial...

Страница 6: ...nd FM approved Approvals B cFMus approved C UL listed approved D NFPA compliant E ULC approved F CCC X Special 1 Cast iron Casing material 2 Ductile iron X Special 7 Silicon bronze ASTM B584 Impeller...

Страница 7: ...itable for protection during shipment and during covered storage at a job site for a short period between installation and startup The preservatives applied at the factory have an effective life of tw...

Страница 8: ...ommend installing the base plate without the pump Position the foundation and the foundation bolts so that pump inlet and outlet flanges align with the outlet pipes Related information 4 4 2 Foundatio...

Страница 9: ...uate headroom must be provided to accommodate the pump to be handled plus the rigging WARNING Overhead load Death or serious personal injury Only lift the entire pump assembly with the lifting lugs pr...

Страница 10: ...pockets drill small vent holes through the base surface 5 Level off the grout to be flush with the top of the dam 6 Allow the grout to cure usually 48 to 72 hours before tightening the foundation bol...

Страница 11: ...pply before you start any work on the product Make sure that the power supply cannot be switched on accidentally Locate the electrical conduit and boxes so as to avoid obstruction of the pump Check sp...

Страница 12: ...otherwise specified by the customer Carefully check the packing allowing a slight leakage for lubrication Do not force the packing into a leak proof position as this will create excessive friction and...

Страница 13: ...ates freely 3 Check that the voltage and frequency on the motor nameplate match the current supply 4 Be sure the motor is wired for correct voltage 5 Check that all thermal overload relays are of the...

Страница 14: ...e pump WARNING Electric shock Death or serious personal injury Switch off the power supply before you start any work on the product Starting the motor during pump removal could damage pump and may cau...

Страница 15: ...st be replaced 1 Measure the outer diameter OD of the impeller wear surface or wear ring 8 and the inner diameter ID of the volute wear ring 7 2 Compute the diametrical clearance ID minus OD and compa...

Страница 16: ...depending on the severity of the environment For international destinations this will vary depending on the seaworthiness of the product s export packaging Related information 3 5 Handling and storin...

Страница 17: ...attention to the condition of the shaft seals or the packing and O rings Related information 7 1 Storage 7 1 5 Accessories storage Store accessories according to the manufacturer s instructions Relat...

Страница 18: ...between sleeve and shaft Check gaskets The suction head is insufficient The suction line is drawing air Tighten the line connections The suction lift is too high or there is insufficient NPSH Reduce...

Страница 19: ...r starting Joints are leaking Tighten the joints Tighten the packing Check o ring between sleeve and shaft Replace the gaskets The suction lift is too high or there is insufficient NPSH Reduce the suc...

Страница 20: ...rew impeller 83 Stuffing box 27 Ring stuffing box cover 119 O ring 9 Disposing of the product This product or parts of it must be disposed of in an environmentally sound way 1 Use the public or privat...

Отзывы: