A . Position valve body correctly in wall (see Fig. 5). UP marking is
     on up  side and DOWN marking on down side.

B . Connect water supply through coupling nut to valve assemblies.

Pressure testing 

A . Install a 1/2" iron pipe plug (not included) on both shower and 
     tub outlets. Turn connect2(13#)  to full " ON " and check  all
     connections for leaks.

B. Turn connect2(13#) to " OFF " .

A . Caution: Slowly remove pipe plugs  from shower and tub outlets.

6

B . After wall treatment. Slide  flanges (16#)  onto valves and back 

     against finished wall .

C . Install the handle assembly(17#) (see Fig. 6 ).

A . For tub and shower combined installation,connect bottom outlet
     to spout,connect top outlet to shower arm with proper fittings.
     (see Fig. 7).

7

Fig .6

Fig .4

CAUTION: Allow at least 2" between tub outlet and tub rim.

The dimension for valve centerline to finished wall is 1-7/8" MIN 
to 2-7/8" MAX.Recommended 2-3/8"

Recommended component locations:  (see Fig. 3)

3

8"

1-3/8" ~ 2"

C . Turn on hot and cold water supply lines.
     

D . Rotate connect2(13#) to allow water to flow from tub spout until

     there is no foreign matter in discharge.

Note: H - hot water supply   C - cold water supply

          Up - shower outlet      Down - tub outlet

1A. Shower and / or spout outlet hole: 1-1/4" diameter.

1B. Cut or leave a 1-3/8" to 2" diameter hole(Recommended 1-3/4")

      for the cold water inlet side(the right  side) and for the hot water
      inlet side (the left side). 
      The center to center distance between the cold water inlet and 
      hot is 8". (see Fig. 4)

1

2

Fig .1

For tub installation only, plug top outlet. For shower installation 

only,plug  bottom outlet.(see Fig. 2)

Shut off main water supply. Install rigid casting to 1/2" water lines. 
Tailpieces on casting are threaded for 1/2" threaded pipe and will
accept 1/2" sweat copper.

1-3/8" ~ 2"

Fig .7

TWO HANDLE TUB & SHOWER FAUCET

INSTRUCTION

Adjustable wrench
Groove joint plier

Pipe wrench 
Pipe tape
Phillips screwdriver

Preparation / Assembly

Supply lines
Basin wrench
Hacksaw
Pipe wrench
Tube cutter
Utility knife

Helpful:

Tools:

Require:

12#   washer

15#   adaptor
16#   coupling nut

14#   o-ring

13#   diverter

11#   screw

05#   shank

08#   bonnet

10#   disc

09#   stem

06#   nut
07#   washer

01#   index H

02#   screw

03#   handle
04#   flange

19#   shower arm

21#   spout

20#   shower

17#   index C

18#  shower flange

4

5

Fig .3

CAUTION: Do not turn water off and on repeatedly during initial 
period.

Fig .2

1

2

3

4

5

11

10

17

21

9

7

6

8

13

16

15

14

18

19

20

12

4

8

"

8

"

3

0

"

1A

1B

1A

Fig .5

H

DOWN
(Spout)

C

UP

(Shower)

22#   washer

22

Отзывы: