48

BOILER RATINGS & DIMENSIONS

Natural Gas Ratings

LP Gas (2500 Btu/cu ft.; 93,000 kJ/m

3

)

IBR Net Ratings

IBR Net Ratings

Input

Output

Steam EDR

Steam

Input

Output

Steam EDR

Steam

MBH

kW

MBH

kW

Sq. Ft.

m

2

MBH

kW

MBH

kW

MBH

kW

Sq. Ft.

m

2

MBH

kW

211A-04

630

185

504

148

1,575

147

378

111

1.333

615

180

492

144

1,538

143

369

108

211A-05

860

252

672

197

2,100

195

504

148

1.333

820

240

656

192

2,050

191

492

144

211A-06

1,050

308

840

246

2,625

244

630

185

1.333

1,025

300

820

240

2,563

238

615

180

211A-07

1,260

369

1,008

295

3,150

293

756

222

1.333

1,230

361

984

288

3,075

286

738

216

211A-08

1,470

431

1,176

345

3,675

342

882

259

1.333

1,435

421

1,148

336

3,588

334

861

252

211A-09

1,680

492

1,344

394

4,229

393

1,015

298

1.324

1,640

481

1,312

385

4,121

384

991

290

211A-10

1,890

554

1,512

443

4,808

447

1,154

338

1.310

1,845

541

1,476

433

4,688

437

1,127

330

211A-11

2,100

616

1,680

492

5,392

501

1,294

379

1.298

2,050

601

1,640

481

5,258

490

1,263

370

211A-12

2,310

677

1,848

542

5,971

555

1,433

420

1.290

2,255

661

1,804

529

5,821

542

1,398

410

211A-13

2,520

739

2,016

591

6,521

607

1,565

459

1.288

2,460

721

1,968

577

6,367

593

1,528

448

211A-14

2,730

800

2,184

640

7,067

658

1,696

497

1.288

2,665

781

2,132

625

6,896

642

1,655

485

211A-15

2,940

862

2,352

689

7,608

708

1,826

535

1.288

2,870

841

2,296

673

7,429

692

1,783

522

211A-16

3,150

923

2,520

739

8,154

759

1,957

573

1.288

3,075

901

2,460

721

7,958

741

1,910

560

211A-17

3,360

985

2,688

788

8,696

810

2,087

612

1.288

3,280

961

2,624

769

8,488

790

2,037

597

211A-18

3,570

1,046 2,856

837

9,238

860

2,217

650

1.288

3,485

1,021

2,788

817

9,021

840

2,165

634

211A-19

3,780

1,108 3,024

886

9,783

911

2,348

688

1.288

3,690

1,082

2,952

865

9,550

889

2,292

672

211A-20

3,990

1,169 3,192

936

10,325

961

2,478

726

1.288

3,895

1,142

3,116

913

10,079

939

2,419

709

211A-21

4,200

1,231 3,360

985

10,871 1,012

2,609

765

1.288

4,100

1,202

3,280

961

10,613

988

2,547

746

211A-22

4,410

1,293 3,528

1,034 11,413 1,063

2,739

803

1.288

4,305

1,262

3,444

1,009 11,142 1,037

2,674

784

211A-23

4,620

1,354 3,696

1,083 11,958 1,113

2,870

841

1.288

4,510

1,322

3,608

1,058 11,671 1,087

2,801

821

211A-24

4,830

1,416 3,864

1,133 12,500 1,164

3,000

879

1.288

4,715

1,382

3,772

1,106 12,204 1,136

2,929

858

211A-25

5,040

1,477 4,032

1,182 13,042 1,214

3,130

918

1.288

4,920

1,442

3,936

1,154 12,733 1,186

3,056

896

211A-26

5,250

1,539 4,200

1,231 13,588 1,265

3,261

956

1.288

5,125

1,502

4,100

1,202 13,263 1,235

3,183

933

211A-27

5,460

1,600 4,368

1,280 14,129 1,316

3,391

994

1.288

5,330

1,562

4,264

1,250 13,796 1,284

3,311

970

211A-28

5,670

1,662 4,536

1,330 14,675 1,366

3,522

1,032

1.288

5,535

1,622

4,428

1,298 14,325 1,334

3,438 1,008

211A-29

5,880

1,723 4,704

1,379 15,217 1,417

3,652

1,070

1.288

5,740

1,682

4,592

1,346 14,854 1,383

3,565 1,045

211A-30

6,090

1,785 4,872

1,428 15,763 1,467

3,783

1,109

1.288

5,945

1,742

4,756

1,394 15,388 1,433

3,693 1,082

211A-31

6,300

1,847 5,040

1,477 16,304 1,518

3,913

1,147

1.288

6,150

1,803

4,920

1,442 15,917 1,482

3,820 1,120

211A-32

6,510

1,908 5,208

1,526 16,846 1,569

4,043

1,185

1.288

6,355

1,863

5,084

1,490 16,446 1,531

3,947 1,157

211A-33

6,720

1,970 5,376

1,576 17,392 1,619

4,174

1,223

1.288

6,560

1,923

5,248

1,538 16,979 1,581

4,075 1,194

211A-34

6,930

2,031 5,544

1,625 17,933 1,670

4,304

1,262

1.288

6,765

1,983

5,412

1,586 17,508 1,630

4,202 1,232

211A-35

7,140

2,093 5,712

1,674 18,479 1,720

4,435

1,300

1.288

6,970

2,043

5,576

1,634 18,038 1,680

4,329 1,269

211A-36

7,350

2,154 5,880

1,723 19,021 1,771

4,565

1,338

1.288

7,175

2,103

5,740

1,682 18,571 1,729

4,457 1,306

211A-37

7,560

2,216 6,048

1,773 19,567 1,822

4,696

1,376

1.288

7,380

2,163

5,904

1,730 19,100 1,778

4,584 1,344

211A-38

7,770

2,277 6,216

1,822 20,108 1,872

4,826

1,415

1.288

211A-39

7,980

2,339 6,384

1,871 20,654 1,923

4,957

1,453

1.288

211A-40

8,190

2,400 6,552

1,920 21,196 1,973

5,087

1,491

1.288

211A-41

8,400

2,462 6,720

1,970 21,738 2,024

5,217

1,529

1.288

211A-42

8,610

2,524 6,888

2,019 22,283 2,075

5,348

1,567

1.288

211A-43

8,820

2,585 7,056

2,068 22,825 2,125

5,478

1,606

1.288

211A-44

9,030

2,647 7,224

2,117 23,371 2,176

5,609

1,644

1.288

211A-45

9,240

2,708 7,392

2,167 23,913 2,227

5,739

1,682

1.288

211A-46

9,450

2,770 7,560

2,216 24,458 2,277

5,870

1,720

1.288

14. BOILER RATINGS & DIMENSIONS

Table 14.1: Boiler Rating Information

Models 211A-38 through 211A-46
Are Certified for Natural Gas Only

Steam
Piping

Factor

Boiler

Model

Number

Содержание 211A-04

Страница 1: ...211A Boilers Steam Series Gas Installation Operation Maintenance Manual...

Страница 2: ...ES AND LABELS 24 7 CONNECT GAS PIPING 29 A INSTALL GAS TRAIN 29 B CONNECT PILOT GAS TUBING 29 C INSTALL VENT AND BLEED PIPING 29 D INSTALL GAS SUPPLY PIPING 30 E TEST GAS SUPPLY PIPING 30 8 INSTALL CO...

Страница 3: ...BOXES 1 Throughout this manual you will see special attention boxes intended to supplement the instructions and make special notice of potential hazards These categories mean in the judgment of PB He...

Страница 4: ...ir and ventilation air must be provided for this appliance in accordance with the section of the National Fuel Gas Code entitled Air for Combustion and Ventilation or applicable provisions of the loca...

Страница 5: ...ssisted appliances in Btu hr Note These calculations are not to be used for infiltration rates greater than 0 60 ACH 3 Indoor Air Opening Size and Location Openings connecting indoor spaces shall be s...

Страница 6: ...e top of the space The opening shall communicate directly with the outdoors communicate through a vertical or horizontal duct or communicate with a space that freely communicates with the outdoors The...

Страница 7: ...area through a louver or grille is not known it shall be assumed that wooden louvers will have 25 free area and metal louvers and grilles will have 75 free area iii Nonmotorized dampers shall be fixed...

Страница 8: ...t least 0 02 w c 5 Pa measured at the vent connections c Support the weight of the vent system independently of the boiler draft hood The draft hood is not designed to carry structural loading d Provi...

Страница 9: ...nch 13 mm thick with aluminum backing aluminum side up One half inch 13 mm Hi Temp millboard with aluminum backing would be acceptable as well Place the insulating board on the slab inside the base F...

Страница 10: ...43 129 3 8 3 286 141 3 8 3 591 211A 23 129 3 8 3 286 135 3 429 147 3 734 211A 24 135 3 429 140 5 8 3 572 152 5 8 3 877 211A 25 140 5 8 3 572 146 1 4 3 715 158 1 4 4 020 211A 26 146 1 4 3 715 151 7 8 3...

Страница 11: ...bly Burner Support Channel Angle Tie Brace Front Panel Support Bracket Section Assembly Kit Front Panel Sub Assembly Back Panel Sub Assembly Burner Support Channel Angle Tie Brace Front Panel Support...

Страница 12: ...using 5 16 18 x 1 25 mm long cap screws and hex head nuts See Table 2 1 for panels required Place the panels in the positions shown in the table and Figure 2 1 8 Complete the base assembly by attachin...

Страница 13: ...11A 26 2EE 2EE 2EE 2BB 12 4 1 2 3 772 211A 27 2EE 2EE 2EE 2CC 12 10 1 8 3 915 211A 28 2EE 2EE 2EE 2DD 13 3 3 4 4 058 211A 29 2EE 2EE 2EE 2EE 13 9 3 8 4 201 211A 30 2DD 2DD 2DD 2DD 2CC 14 3 4 343 211A...

Страница 14: ...the Boiler Sections are installed 1 4 X 1 1 2 38 mm long Nipple 2 1 4 Street Elbow Imperial 69F Elbow 1 8 NPT x 1 4 O D Tubing PB H91BG 2 or H V8046C Pilot Gas Valve 1 4 x 1 8 Hex Bushing 3 8 Thermop...

Страница 15: ...211A 24 3 46 21 5 39 9 23 39 211A 25 3 48 25 5 45 9 23 41 211A 26 4 50 19 5 33 47 9 23 33 45 211A 27 4 52 21 5 35 49 9 23 35 45 211A 28 4 54 23 5 37 51 9 23 35 47 211A 29 4 56 27 5 39 53 9 23 39 49 2...

Страница 16: ...n the grooves on each end of the section Place the rope in the grooves Do not stretch the rope The longer rope goes in the front groove NOTE The ends of each rope must extend 1 2 13 mm beyond the top...

Страница 17: ...15 Figure 3 3 Assembling Sections on Base PLACE THE BOILER SECTIONS...

Страница 18: ...d section 3 Provide a water supply line to the boiler 4 Plug all open tappings in the boiler 5 Provide a means to vent air as the boiler fills 6 Fill the boiler with water venting air as water level r...

Страница 19: ...op of each Collector section with two 10 x 1 2 13 mm long sheet metal screws See Figure 4 2 5 Insert a Long Hook Bolt part number GG 5003 through the angle bracket Slip the hook end over the tie rod A...

Страница 20: ...A 211A 29 14B 14B 14B 14B 14A 14A 211A 30 14B 14B 14B 14B 14B 14A 211A 31 14B 14B 14B 14B 14B 14B 211A 32 14B 14B 14B 14A 14A 14A 14A 211A 33 14B 14B 14B 14B 14A 14A 14A 211A 34 14B 14B 14B 14B 14B 14...

Страница 21: ...of the steam main See Figure 5 3 for this special case 7 The piping in these drawings is shown off the right hand side of the boiler The boiler may also be piped toward the left side as shown in Figu...

Страница 22: ...20 PIPE THE BOILER Figure 5 2 Supply and Return Piping Pumped Return and Parallel Flow Gravity Systems...

Страница 23: ...s of the boilers Always use Boiler feed units a Install a Float and Thermostatic trap at the boiler water level on each of the multiple boilers on a pumped return system This prevents flooding of idle...

Страница 24: ...22 PIPE THE BOILER Figure 5 6 Piping Multiple Boilers Typical Pumped Return Systems Figure 5 5 Piping Multiple Boilers Typical Gravity Return Systems...

Страница 25: ...el GG 6023 flange on right side of panel under the edge of the Right Front Corner Panel Place the left edge of the Front Panel over the offset flange of the Left Front Corner Panel Line up the screw h...

Страница 26: ...ointed down Peel the insulation slightly away from the back edge of the panel for better contact Secure with one 10 x 1 2 13 mm long sheet metal screw 3 Slide the left hand offset flange of the first...

Страница 27: ...anel Guide GG 6031 Lower Rear Panel GG 6026 Rear Panel Support Leg GG 6028 Top Panel GG 6024 Top Right End Panel GG 6019 Front Panel GG 6023 Right Front Corner Panel GG 6015 Front Jacket Panel Support...

Страница 28: ...31 1 Sheet Metal Screws 23 Jacket Intermediate Panel Front GG 6023 2 1 Jacket Intermediate Panel Top GG 6024 2 1 Jacket Intermediate Panel Upper Rear GG 6025 2 1 12C Jacket Intermediate Panel Lower Re...

Страница 29: ...27 INSTALL THE JACKET DRAFT HOOD Figure 6 3 Jacket Assembly Sequence Carton Numbers and Locations...

Страница 30: ...3C 13C 13B 13B 13B 13B 211A 28 13C 13C 13C 13B 13B 13B 211A 29 13C 13C 13C 13C 13B 13B 211A 30 13C 13C 13C 13C 13C 13B 211A 31 13C 13C 13C 13C 13C 13C 211A 32 13C 13C 13C 13B 13B 13B 13B 211A 33 13C 1...

Страница 31: ...lots to the Pilot Gas Valves b Connect standing pilots when supplied see Table 2 2 to the thermopilot valves c Install thermocouples in the standing pilots and connect to the thermopilot valves C INST...

Страница 32: ...sized and adjusted properly to provide this pressure under all conditions 4 Install a Service Valve Sediment Trap and Ground Joint Union at the supply connection to the Gas Control Train as shown in F...

Страница 33: ...Foot3 Meter3 Foot3 Meter3 Foot3 Meter3 Foot3 Meter3 Foot3 Meter3 10 3 0 1050 30 1 600 45 3 050 86 4 800 136 8 500 241 17 500 496 44 000 1246 20 6 1 730 21 1 100 31 2 100 59 3 300 93 5 900 167 12 000 3...

Страница 34: ...automatic reset type b When a manual reset control is required the boiler can be supplied with Hydrolevel Model 550P 5 Provide each float low water cut off with a blowdown valve Pipe the blowdown away...

Страница 35: ...33 INSTALL CONTROLS AND TRIM Figure 8 2 Pressure Control Piping Fittings Included with Boiler...

Страница 36: ...CONTROLS AND TRIM Figure 8 4 Optional Feeder Low Water Cut Off Model 47 2 Used Only on Models 211A 04 through 211A 08 Capacity Not Adequate for Larger Boilers Figure 8 3 Standard Float Type COntrol M...

Страница 37: ...35 INSTALL CONTROLS AND TRIM Figure 8 5 Optional Float Type Pump Control Low Water Cut Off Model 157...

Страница 38: ...ler Foundation 10 3 8 264 mm 10 7 8 276 mm 36 914 mm 4 1 8 105 mm 8 1 8 206 mm Install 1 Blowoff Valve Burner Cut Off Level is Below Center Line on 51 2 and 51 S 2 Controls Below Normal Water Line 1 1...

Страница 39: ...components C INSTALL CONTROL WIRING 1 Wire the boiler according to the wiring diagram supplied with the boiler in the Control Envelope Figure 9 1 is a typical layout of the components on the boiler Fi...

Страница 40: ...38 WIRE THE BOILER Figure 9 2 Typical Wiring Standard Controls Low Voltage Gas Valves...

Страница 41: ...39 WIRE THE BOILER Figure 9 3 Typical Wiring Standard Controls 120 Volt Gas Valves...

Страница 42: ...ll for heat g Wait 60 seconds to allow the control to reset before proceeding with the next step 5 Light Manual Pilots a Follow the procedure in the Lighting Instructions to manually light any standin...

Страница 43: ...sludge etc that may be in the system These substances can cause foaming and surging of the boiler water producing an unstable water line and water carryover to the system 3 The piping for a skim valv...

Страница 44: ...s will light 12 The burners will continue to fire until the Operating Control is satisfied B TO SHUT DOWN THE BOILER 1 Open main line power disconnect switch to boiler 2 Close Main and Pilot gas shut...

Страница 45: ...Measures Provide adequate ventilation Wear a NIOSH MSHA approved respirator Wear long sleeved loose fitting clothing and gloves to prevent skin contact Wear eye goggles Minimize airborne dust prior to...

Страница 46: ...se a soap suds mixture to check the gas tightness of all gas joints 5 Test the limit and operating controls to assure they are operating correctly 6 Inspect and test all low water cut offs Float type...

Страница 47: ...rom top of boiler e Replace the flue collector draft hood jacket and cleanout panels using the procedures given in this manual f Remove the burners and brush the gas ports lightly with a soft bristle...

Страница 48: ...ks or System Causing Low Water Cut off to Function Check Feeder if Supplied Defective Thermopilot Valve s Replace Defective Thermocouple s Replace High Gas Pressure Switch Open Check Switch Setting if...

Страница 49: ...ate loads Close nipple on Hartford too high Repipe 2 to 4 5cm to 10cm Below Water Line Water Hammer on Shut Down Uninsulated steam piping in boiler room but system piping insulated causing vacuum Insu...

Страница 50: ...087 2 801 821 211A 24 4 830 1 416 3 864 1 133 12 500 1 164 3 000 879 1 288 4 715 1 382 3 772 1 106 12 204 1 136 2 929 858 211A 25 5 040 1 477 4 032 1 182 13 042 1 214 3 130 918 1 288 4 920 1 442 3 93...

Страница 51: ...49 BOILER RATINGS DIMENSIONS...

Страница 52: ...2 572 22 572 22 572 30 776 211A 32 185 4 715 211 5 382 65 165 179 4 553 2 3 30 776 28 714 22 572 22 572 22 572 22 572 30 776 211A 33 191 4 858 217 5 525 65 165 184 4 696 2 3 24 633 22 572 22 572 22 57...

Страница 53: ...9 28 714 28 714 25 645 22 572 22 572 13 346 6 14 356 29 737 29 737 211A 29 16 419 28 714 28 714 28 714 25 645 22 572 13 346 6 14 356 29 737 29 737 211A 30 16 419 28 714 28 714 28 714 28 714 25 645 13...

Страница 54: ...ly w Insulation 28 1 8 714 mm Wide GG2081 2 33 3 4 857 mm Wide GG2081 3 39 3 8 1 m Wide GG2081 4 For 16 7 8 429 mm Wide Panel 50848 For 22 1 2 571 mm Wide Panel 50849 11 Base Front or Back Panel Insul...

Страница 55: ...Bolt 1 Required Per Flue Collector GG5003 25 Black Flue Collector Hook Bolt 1 Required Per Flue Collector GG5004 26 Flue Collector Mounting Bracket 1 Required Per Flue Collector 27 Hi Temp Rope for F...

Страница 56: ...54 REPAIR PARTS SERIES 211A Figure 15 1 Boiler Assembly...

Страница 57: ...55 REPAIR PARTS SERIES 211A Figure 15 2 Base Assembly...

Страница 58: ...56 NOTES...

Страница 59: ...anual is the property of the owner and must be affixed near the boiler for future reference TO THE OWNER This boiler should be inspected annually by a Qualified Service Agency HI Division of gama ASME...

Отзывы: