peerless-AV DS-LEDL27-12X6 Скачать руководство пользователя страница 30

30

2020-03-17    #:146-9043-5    (2020-11-09)

6-6

Adjust depth, then remove string.

ENG

Loosen, adjust, tighten.

ENG

G

Содержание DS-LEDL27-12X6

Страница 1: ...1 2020 03 17 146 9043 5 2020 11 09 DS LEDL27 Series Actual configuration may vary ENG Installation video for reference only Read and follow instruction manual for full installation...

Страница 2: ...secured Do not overtighten screws or damage can occur and product may fail Never exceed the Maximum Load Capacity Always use an assistant or mechanical lifting equipment to safely lift and position eq...

Страница 3: ...146 9043 5 2020 11 09 Tools Needed for Assembly ENG 5 32 4mm 3 8 10mm 2 5mm 1 2 ENG To properly tighten screws Tighten until screw head makes contact then tighten another 1 2 turn Do not overtighten s...

Страница 4: ...ch two tip T handle H M5 x 5mm set screw I 14 x 1 75 wood screw J M5 x 8mm K wall plate shim L M5 x 12 mm M top horizontal asy N bottom horizontal asy O top left horizontal asy P top right horizontal...

Страница 5: ...5 2020 03 17 146 9043 5 2020 11 09 O M P N Q R top left horizontal asy top horizontal asy top right horizontal asy bottom horizontal asy bottom left horizontal asy bottom right horizontal asy...

Страница 6: ...09 1 1 Optional If connecting two top horizontal extrusions first remove inner hook on brackets ENG Remove and save hardware ENG M O M P 1 2 Use extrusion connectors to connect top horizontal extrusi...

Страница 7: ...1 Optional If connecting two bottom horizontal extrusions first remove inner hook on brackets ENG Remove and save hardware ENG N R N Q 1 3 Replace one hook on bracket in between connected extrusions E...

Страница 8: ...6 9043 5 2020 11 09 N R N R N Q N Q 2 2 Use extrusion connectors to connect bottom horizontal extrusions ENG H 6 F 3 2 3 Replace one hook on bracket in between connected extrusions ENG Use saved hardw...

Страница 9: ...sum board drywall up to 5 8 thick WARNING 3 2 Use a laser level to keep mounting holes level ENG display tile 7 8 22mm minimum for mounting clearance 2 5 64mm 3 1 ENG When installing more than one dis...

Страница 10: ...10 2020 03 17 146 9043 5 2020 11 09 3 3 Level top horizontal extrusion and mark mounting holes on plywood must be minimum Grade BC 1 2 13mm thick ENG M P...

Страница 11: ...2020 11 09 3 4 Drill mounting holes into supporting surface 1 75 44mm minimum depth required ENG 5 32 4mm 1 75 44mm 5 32 4mm 3 5 Level extrusion Install using wood screws provided ENG 3 8 10mm Maximum...

Страница 12: ...12 2020 03 17 146 9043 5 2020 11 09 3 6 Secure vertical spacers to the wall flush with the horizontal extrusion ENG 3 8 10mm Edges must be flush ENG D I M O D I...

Страница 13: ...5 2020 11 09 3 7 Use third vertical spacer to align bottom horizontal extrusion flush with vertical spacer then mark mounting holes on plywood must be minimum Grade BC 1 2 13mm thick ENG D Edges must...

Страница 14: ...to align bottom horizontal extrusion flush with vertical spacer then install using wood screws provided ENG 3 8 10mm Maximum 80 in lb 9 N M ENG 3 8 Drill mounting holes into supporting surface 1 75 4...

Страница 15: ...15 2020 03 17 146 9043 5 2020 11 09 3 10 Remove vertical spacer ENG 3 8 10mm D I...

Страница 16: ...16 2020 03 17 146 9043 5 2020 11 09 4 1 Hook on and secure outer vertical columns L and R markings designate left and right column ENG A B J Tighten hardware ENG G...

Страница 17: ...17 2020 03 17 146 9043 5 2020 11 09 4 2 Hook on and secure all inside vertical columns ENG C Tighten hardware ENG J G...

Страница 18: ...18 2020 03 17 146 9043 5 2020 11 09 5 1 Loosen hardware on vertical columns ENG G...

Страница 19: ...19 2020 03 17 146 9043 5 2020 11 09 5 2 Tighten ENG Tighten ENG Plumb and level outer columns then tighten hardware Tighten hardware on four corner wall plates ENG G...

Страница 20: ...5 2020 11 09 Tighten ENG Loosen ENG Optional leveling for bowed walls ENG Insert ENG K 5 3 Tie a string between top slots on outer columns in order to level the depth of each vertical column ENG Loose...

Страница 21: ...2020 11 09 Tie a string between bottom slots on outer columns in order to level the depth of each vertical column ENG Loosen adjust tighten ENG 5 4 Tighten ENG Loosen ENG Optional leveling for bowed...

Страница 22: ...22 2020 03 17 146 9043 5 2020 11 09 5 5 With the string still attached level the height of each column ENG Tighten or loosen to adjust height ENG G...

Страница 23: ...23 2020 03 17 146 9043 5 2020 11 09 E 5 6 Adjust inner columns to fit horizontal spacers Tighen column hardware after spacing Start from the left column ENG G...

Страница 24: ...24 2020 03 17 146 9043 5 2020 11 09 5 7 Continue adjusting inner columns to fit horizontal spacers until all are level Tighen column hardware after spacing ENG G E...

Страница 25: ...25 2020 03 17 146 9043 5 2020 11 09 5 8 Remove all spacers ENG E...

Страница 26: ...3 17 146 9043 5 2020 11 09 6 1 Optional For shallow depth installations flip wall bracket orientation as shown ENG G display tile wall 2 65 67mm MAX 2 25 57mm MIN display tile wall 3 05 77mm MAX 2 60...

Страница 27: ...27 2020 03 17 146 9043 5 2020 11 09 6 2 Level L brackets and mark mounting holes on plywood must be minimum Grade BC 1 2 13mm thick ENG...

Страница 28: ...2020 11 09 6 3 Drill mounting holes into supporting surface 1 75 44mm minimum depth required ENG 5 32 4mm 1 75 44mm 5 32 4mm 6 4 Level L brackets Install using wood screws provided ENG 3 8 10mm Maxim...

Страница 29: ...29 2020 03 17 146 9043 5 2020 11 09 6 5 Tie a string between center slots on outer column in order to level the depth of each vertical column ENG G...

Страница 30: ...30 2020 03 17 146 9043 5 2020 11 09 6 6 Adjust depth then remove string ENG Loosen adjust tighten ENG G...

Страница 31: ...31 2020 03 17 146 9043 5 2020 11 09 7 1 x3 ENG Display module not included L 1 8 3mm G...

Страница 32: ...020 03 17 146 9043 5 2020 11 09 7 2 ENG Attach display module frames onto keyhole slot Attach and tighten connecting hardware then run cables one at a time starting from the bottom left S L S 1 2 3 4...

Страница 33: ...33 2020 03 17 146 9043 5 2020 11 09 7 3 6 7 8 9 10 S ENG Finish attaching display module frames Attach and tighten connecting hardware then run cables one at a time starting from the bottom left...

Страница 34: ...34 2020 03 17 146 9043 5 2020 11 09 7 4 ENG Attach display modules not included...

Страница 35: ...35 2020 03 17 146 9043 5 2020 11 09 10 5 9 4 8 3 2 1 8 ENG To remove start from the top right G...

Страница 36: ...al Escobedo General Escobedo N L M xico 66062 Servicio al Cliente 01 800 849 65 77 www peerless av com 2020 Peerless Industries Inc Peerless AV 2300 White Oak Circle Aurora IL 60502 Email tech peerles...

Отзывы: