![Peco 28131502 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/peco/28131502/28131502_operators-manual_1519832016.webp)
16
Bag Assembly
First, take one of the Bag Ring Split Ends and insert it through the Bag Seam Opening. Next, rotate the Bag around the
Bag Ring (1) full turn (360 degrees) until the Bag Ring Split Ends and the Bag Seam Opening are positioned on the same
side. Then, connect the Bag Ring Split Ends using (1) End Connector. Last, rotate the Bag Ring and the End Connector
Assembly (1/2”) turn (180 degrees) to position the Connector opposite of the Bag Seam Opening. Note Final End
Connector Location below in Figure A. Repeat for each Bag.
Bag Assembly Installation
Slide the Completed Bag Assembly into the Upper Frame Assembly Rails and close the Top Assembly. Fasten the Draw-
Latch on either side to hold the bagger closed.
Bag Ring
Split Ends
Bag Seam
Opening
Bag Ring
End
Connector
Completed
Bag Assembly
Note Final
End Connector
Location
Bag
Top Assembly
Draw-Latch
Upper Frame
Assembly
Rail
Mesh
Panel
Nylon
Panel
Mesh
Panel
Figure A
Содержание 28131502
Страница 28: ...28 A2207 Mount Arm Tube Assembly...
Страница 30: ...30 A2058 Gearbox Sub Assembly...
Страница 31: ...A2059_01 Clutch Sub Assembly...
Страница 32: ...32 A2057_01 Drive Assembly Exploded Parts View...
Страница 33: ...A2060_01 Mounted Drive Assembly...
Страница 34: ...34 A2039_02 Base Drive Assembly...
Страница 35: ...A2061_02 Drive Assembly 4 Blade Impeller...
Страница 36: ...36 A1158 Top Assembly w PECO Logo Exploded Parts View...
Страница 37: ...A1157 Top Assembly w Dual Latch Exploded Parts View...
Страница 38: ...38 A2223 Top Assembly Base Model Exploded Parts View...
Страница 39: ......
Страница 43: ......
Страница 45: ...NOTES...