72
72
8.4 FITTING OUT
Fitting out is the performance of the tasks required to
place a yacht into service after a lay-up period. Since it
is, in effect, the recommissioning of the vessel, the
procedure provided in Section 3 (Commissioning) of this
manual should once again be followed along with these
additions:
Follow the procedure outlined in the engine manual for
placing the engine back in service after lay-up.
Follow manufacturers1 instructions for placing the follow-
ing equipment back in service:
- pressure water system
- hot water system
- head system
- steering system
- winches
- other optional system
If the mast was removed during lay-up, the tuning proce-
dures outlined in paragraphs 3.3 and 3.4 should be
performed in addition to the steps in the commissioning
procedure.
Make a complete inspection of all standing and runninp~
rigging. Look for signs of stress or cracking at fittings ;
evidence of fraying, chafing, kinking; cotter pins~ are
secure and taped. Pay particular attention to the wire-to-
rope splice on halyards.
Содержание P31-II
Страница 23: ...23 23...
Страница 24: ...24 24...
Страница 25: ...25 25...
Страница 26: ...26 26...
Страница 27: ...27 27...
Страница 28: ...28 28...
Страница 29: ...29 29...
Страница 32: ...32 32...
Страница 35: ...35 35...
Страница 42: ...42 42 4 6 2 4 To reconnect coupling...
Страница 45: ...45 45...
Страница 46: ...46 46...
Страница 48: ...48 48...
Страница 50: ...50 50...
Страница 51: ...51 51...
Страница 56: ...56 56...
Страница 58: ...58 58...
Страница 59: ...59 59...
Страница 60: ...60 60...
Страница 61: ...61 61...
Страница 64: ...64 64...
Страница 74: ...74 74...
Страница 75: ...75 75...
Страница 76: ...76 76...
Страница 78: ...78 78...
Страница 79: ...79 79...
Страница 80: ...80 80...
Страница 81: ...81 81...
Страница 82: ...82 82...