![PEAKnx Controlpro Dual-Core 4 GB RAM 250 GB SSD Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/peaknx/controlpro-dual-core-4-gb-ram-250-gb-ssd/controlpro-dual-core-4-gb-ram-250-gb-ssd_user-manual_1517436020.webp)
Controlpro - User manual
20
6.4 Connecting and fastening the panel
Avoid damage to the panel due to early commissioning!
■
Note the climatic conditions at the installation site!
■
Before switching on the mounted device, the device must have adapted to
the climatic conditions at the installation site.
■
Temperature and humidity differences can cause damage to the unit.
Preparation
■
Place the screws (M5x16) included in the scope of delivery within reach for
fixing the panel within the flush-mounted box.
■
For further notes on the panel‘s ports, please read
section 3.8.
Connection of the panel
■
Push the prepared 15-20 V connector terminals back into the appropriate
connectors in the panel (C1 and C2).
■
Connect the Ethernet cable to the panel (D4).
■
Plug the KNX cable with the colors red (+) and black (-) into the KNX-terminal
“1” (C3).
Mounting the panel
■
Install the panel into the flush-mounted box. Use the four counter-sunk screws
(M5x16) for fixing it in the flush-mouted box.
Note:
Make sure that the ventilation openings (B5) are not partially or fully
covered to ensure convection ventilation of the computer in the panel.
Attaching the glass cover
■
Place the glass cover with the magnetic holders into the four intakes provided
and continue until the glass rests against all four corners of the touchscreen.
■
Ensure that the opening for the camera is positioned on the upper screen.
Содержание Controlpro Dual-Core 4 GB RAM 250 GB SSD
Страница 1: ...Controlpro User manual...
Страница 30: ...Controlpro User manual 30...
Страница 32: ...www peaknx com...