
© 2021-03 PEAK-System Technik GmbH - www.peak-system.com
Final Check
Open the page
Routing >> Manage Routes
on both devices.
If the Status LEDs of the Send route on Gateway 1 and the
Receive route on Gateway 2 are green, everything is fine and the
unidirectional message forwarding is working.
Please note:
If you like to setup a bidirectional message
transmission, you have to create a message forwarding in the
opposite direction. For this a Send route on Gateway 2 and a
Receive route on Gateway 1 are required.
A detailed description of this application example is available in
the documentation of your PCAN-Gateway.
Video Tutorials
With short video tutorials on YouTube, we demonstrate how to
configure and use the PCAN-Gateways.
www.youtube.com/user/peaksystemtechnik
Содержание IPEH-004010
Страница 1: ...PCAN Gateway Quick Start Guide...