background image

Safety Notice

5

Safety First

It is important that you thoroughly read and understand this manual before 
operating or servicing this Peak Scientific Instruments Gas Generator. 

PLEASE NOTE THE FOLLOWING CAUTIONS AND WARNINGS FOR 
YOUR OWN SAFETY.

! Caution –
Only authorized persons should operate or service this equipment.

! Warning –
To avoid risk of electrical shock, personal injury, or death disconnect 
power before removing any cover of this equipment.

! Caution –
To avoid risk of personal injury NEVER disconnect any pipe, fitting, 
or filter bowl while the system is pressurized. Always allow pressure 
to dissipate before opening the system.

! Warning –
The Catalytic Process requires very high temperatures.  Internal
surfaces and copper lines are extremely hot and will cause burns. 
Always allow the generator to cool before carrying out any servicing.

ZA-070-19”Rack System Gas Generator

UM – ZA-070  

Содержание Zero Air ZA015

Страница 1: ...USER MANUAL UM Zero Air 19 Rack System ZERO AIR GAS GENERATOR...

Страница 2: ...tions 11 Maintenance Schedule 10 Commissioning 9 Principle of Operation 8 Electrical Air Connection 4 4 5 6 7 Warranty Statement Safety Notice to Users Safety Notice Declaration of Conformity Introduc...

Страница 3: ...cB Weight of unit changed to 13kg 6 10 11 04 FAD Technical Support number updated 5 30 03 05 FAD New style front added 4 16 11 04 FAD USA Technical support number updated 3 25 01 02 SGM Digital PID Co...

Страница 4: ...e 4 In the event of the Customer making a claim in respect of any defect in terms of clause 2 hereof the Customer must 4 1 reasonably satisfy the Company that the Goods have been properly installed co...

Страница 5: ...f electrical shock personal injury or death disconnect power before removing any cover of this equipment Caution To avoid risk of personal injury NEVER disconnect any pipe fitting or filter bowl while...

Страница 6: ...Declaration of Conformity 6 Declaration of Conformity ZA 070 19 Rack System Gas Generator UM ZA 070...

Страница 7: ...ar The generator should be placed on a steady and level base The generator is designed to be installed inside a standard 19 telecom cabinet The generator requires 4U space overall Performance of the g...

Страница 8: ...uld be connected to the outlet on the right side of the cabinet To avoid leakage impurity ingress use PTFE tape on all fittings Slowly turn on the air supply until the required pressure is attained Th...

Страница 9: ...o Air catalytic combustion chamber This works on the principle of catalytic oxidation where hydrocarbons from the incoming compressed air supply are cracked to carbon dioxide and water The hydrocarbon...

Страница 10: ...it Refit the lid Open the air supply and switch the Power supply ON to unit Set the regulator on the front panel Regulator to the desired pressure Check that the cooling fan at the rear of the generat...

Страница 11: ...l number of parts the Peak Zero Air Generator will have a long and trouble free life However as with all scientific and technical equipment it should be regularly inspected by a competent person and t...

Страница 12: ...Serviceable Parts List 0 01um Particles 60 minutes Start up time 10 Amps Fuse 7 Litres min ATP Maximum Outlet Flow 100 psig Maximum Gas Outlet Pressure 8 psig Maximum Pressure Drop Outlet Inlet P Out...

Страница 13: ...Pneumatic Pneumatic Diagram 13 Heater Rod Thermocouple Outlet ZAxxx Pneumatic Diagram Inlet Filter Regulator Cat Chamber Cooling Coil ZA 070 19 Rack System Gas Generator UM ZA 070...

Страница 14: ...15 ZA015 070 19 Rack System Gas Generator UM ZA015 070 Electrical Diagram Electrical Diagram 14 ZA 070 19 Rack System Gas Generator UM ZA 070...

Страница 15: ...Maintenance Log Name Date Remarks Work Done Model Serial number Maintenance log 15 ZA 070 19 Rack System Gas Generator UM ZA 070...

Страница 16: ...Notes 16 ZA 070 19 Rack System Gas Generator UM ZA 070...

Отзывы: