www.modellmarkt24.ch; www.modellmarkt24.de
PINO 3.0 Building Instruction
August 2018
www.pcm.at
10
Then glue again a thin piece
of GFR to the wirings and the
soldered parts.
So you
insulate
and
strengthen
the soldered
parts.
Now glue the
left
and the
right cable part together
.
The rest of the contacts have
to be
insulated
.
Before you fix the contacts to
the fuselage with a runny
super glue, make a
test, if
everything is contacted
well
.
5.3 Accumulators
Pack the Eneloop cells
the
way it is shown in the picture.
www.modellmarkt24.ch; www.modellmarkt24.de