6
if user doesn't key-in any. The name is consisted by current date and time. For
example if point name is "05-06 09:21:51" means the date is 6th May and the time is
09:21:51.
Note 2: Meter automatic defines the name of the measured point by current date and
time.
Note 3: Logger setting defined by Start-Date, Begin-time, Suspend-time, End-Date,
and sample rate. Each logger starts from Start-Date & time, sampling by specified
rate until Suspend-time. Start again next day until End-Date.
Logger is stopped by reaching End-Date or 99 points or press "0" key twice.
5.Front View