background image

Q1 

: Phase

measured di

Qt 

: Total re

Kvar 

: Reac

Kvarh, Mv

S1 

: Phase 

measured di

St 

: Total ap

KVA 

: Appa

: Apparent e

TIME 

: Cu

Y-M D-h m

INTV 

: Aut

START 

: E

STOP 

: Ene

U1, V, A 

: 1

U1, V, A, U

U12, V, I1, 

U1, V, A, U

: Voltage 

: Current 

1000V 

: Vol

250A, 500A

 
 

V. OPERAT

 
 

  If  poss

equipme

 
 
 

 Voltage

insulate

 Do not c

 

 Always 
  Make  c
 Connec
 Remove

e 1 reactive 

isplay indicat

eactive power

ctive power u

varh 

: Reactiv

1 apparent 

isplay indicat

pparent powe

arent power u

energy unit. 

rrent data and

m-s 

: Date and

to datalogging

nergy calcula

ergy calculati

1P2W phase U

U2, V, A 

: 1P3

mea

A, U23, V, I2

U2, V, A, U3, V

unit. 

unit. 

ltage range in

A, 1000A 

: Cu

TING INSTRU

ible,  before  

ent’s power. 

e input conne
ed. 

connect the u

set up the me

connections  t

ct the ground

e all test lead

power measu

tion. 

Q3 

: Pha

r measured d

unit. 

ve energy uni

power measu

tion. 

S3 

: Pha

r measured d

unit. 

KVAh 

d time indicat

d time display

g interval tim

ating start tim

ing stop time 

U1 voltage an

W phase U1,

asured display

2, A 

: 3P3W2

indicati

V, A 

: 3P4W 

indicat

ndication. 

urrent range i

UCTION 

connecting  t

ctors U1 to U

unnecessary n

easurement fi

to  the  instrum

 lead first, th

s that are not 

ured display 
ase 3 reactive

display indicat

it. 

ured display 

ase 3 apparen

display indica

Apparent ene

tion. 

yed. 

me setting ind
me indication.

indication. 

nd current pro

, U2 voltage a

y indication.

2M phase U12

ion. 

phase U1, U2

tion. 

indication (A

the  meter  to 

U3 are comm

number of cor

first, then con

ment  first,  be

hen the voltag

in use. 

indication. 

Q

e power meas

tion and total

indication. 

nt power meas
ation and total

ergy unit. 

MV

ication. 

ove I1 measu
and current p

2, U23 voltag

2, U3 voltage

Autoranging)

CAUTION

 the  electrica

DANGER

mon for input

rds. 

 

WARNING

nect the test l

efore  connect

ge leads and

Q2 

: Phase

sured display 

l reactive ene

S2 

: Phase 2

sured display
l apparent ene

VAh 

ured display in

robe I1, I2 

ge and curren

e and current 

N

 

al  equipment 

R

 

connector N

G

 

leads to the c

ting leads  to 

the current p

i

2 reactive p

indication. 

ergy measured

2 apparent  p

y indication. 

ergy measure

ndication. 

nt probe I1, I2

probe I1, I2, 

 to  be tested,

N, each input c

ircuit. 
 a  live  circuit

probe, Discon

info@tursdaletec

ower 

d display indi

power 

ed display ind

2 measured di

I3 measured

, take off the 

connectors ar

t. 

nnect in rever

chnicalservices.co

 

ication. 

dication. 

isplay 

d display 

electrical 

re not 

rse order. 

 
 

o.uk

 

 

13

Содержание PCE-360

Страница 1: ...le Technical Services Ltd Unit N12B Tursdale Business Park Co Durham DH6 5PG United Kingdom Phone 44 0 191 377 3398 Fax 44 0 191 377 3357 info tursdaletechnicalservices co uk http www industrial needs...

Страница 2: ...2 Wire 1P2W Power System Measurement 17 5 3 Single Phase 3 Wire 1P3W Power System Measurement 20 5 4 Three Phase 3 Wire 3P3W Power System Measurement 23 5 5 Three Phase 4 Wire 3P4W Power System Measu...

Страница 3: ...is manua affixed to th ng relevant f tes explanat meter ges ected throu use only s 61010 1 2n n and warni ing conditio DANGE ncorrect me ter Please e meter DANGE ey look dam around ba ric shock t exce...

Страница 4: ...osed to allow the mete cuits take a rubber glove e power off b ck and short measured to th on presents ex erious injury ation presents o the user ion presents p erformance o maximum perf CAUTI be safe...

Страница 5: ...as possible as nuals energized ch irst then conn in use rst before con hen the voltag quality includ f components ed personnel quality troub quickly im em performan een and is ca suring a neut ngle ph...

Страница 6: ...0 minut on the BT i me Auto off a ox 1 time pe onic analyzer pening diamet re 0 C to 40 Maximum re 31 C decrea 40 C non co ent 0 1 sp and humidity 235 L 117 probe 193 ng battery e approx 3 ement Categ...

Страница 7: ...error measuremen Accuracy 0 3 rdg 10dg 50V S voltage val Measureme Accuracy luding current p 0 5 rdg 15dg 3A S current valu T ADAPTOR II 600V per IE Edition and IE mum Output i Co Ltd II 1000V AC Ent...

Страница 8: ...nels Polarity display For phase lag LAG current is slower than voltage No symbol For lead phase LEAD current is faster than voltage Power Factor measurement COS Range Resolution Calculated Accuracy 0...

Страница 9: ...9KVAh 0 1KVAh 3 999MVAh 0 001MVAh 39 99MVAh 0 01MVAh 119 3MVAh 0 1MVAh Measurement display Display all apparent power energy sum of absolute values Reactive Power Energy measurement Kvarh Range Resol...

Страница 10: ...info tursdaletechnicalservices co uk 10 IV PARTS CONTROLS 4 1 Description of Parts Control keys...

Страница 11: ...ode for auto d e and time co current data and time or r gging function ing function a memory con play reading ber is display mory data cont easured powe d in cycles ntegrated pow unctions key ciator i...

Страница 12: ...measured display indication KW Active power unit KWh MWh Active energy unit PF1 Phase 1 power factor measured display PF2 Phase 2 power factor measured display PF3 Phase 3 power factor measured displ...

Страница 13: ...ement fi to the instrum lead first th s that are not ured display ase 3 reactive display indicat it ured display ase 3 apparen display indica Apparent ene tion yed me setting ind me indication indicat...

Страница 14: ...or loose s uit with voltag king around b h voltages ab Warning k or personal i e Current Cla er and for loo y particular nt Clamp If e Current Cla ndicular to the sure the con es when maki ose to othe...

Страница 15: ...g the load on a ng the load on a t Adaptor re able to the ins of the clamp clamp jaws ar W personal injur Wire 1P2W ranch circuit cal distribution tage rent monics use PC monics use PC veform use PC e...

Страница 16: ...eads and current probe to the electrical equipment to be tested take off the electrical equipment s power Connect the black voltage test alligator to the Neutral Line N Connect the red voltage test al...

Страница 17: ...nected to voltage source during the measurement of U2 U3 I1 I2 and I3 because U1 is the main signal source of the whole meter measuring system Otherwise you could not have any measurement from U2 U3 I...

Страница 18: ...nnect the I4 current probe output plug to the I4 jack 4 Connect the voltage test leads and current probe to the electrical equipment to be tested CAUTION If possible before connecting the voltage test...

Страница 19: ...urement Press ENERGY key the Pt Qt St and PFt or t annunciator and energy integrate start time are displayed The energy integrate value and the current time will be continuous accumulate a KW displays...

Страница 20: ...voltage and current waveforms become distorted causing voltage drops they can cause voltage unbalance reverse phase to neutral voltage and harmonics may cause accidents such as uneven motor rotation...

Страница 21: ...key to select P1 Q1 S1 PF1 P2 Q2 S2 PF2 and Pt Qt St PFt measured values 6 Frequency Hz Phase Angle and Power Factor pF measurement Hz Press Hz key PF1 will show Hz Press PF key to exit Press key PF1...

Страница 22: ...voltage test lead to the U2 terminal Connect the blue voltage test lead to the U3 terminal Connect the I1 current probe output plug to the I1 jack Connect the I2 current probe output plug to the I2 ja...

Страница 23: ...ess Hz key PF1 will show Hz Press PF key to exit Press key PF1 will show Press PF key to exit I4 Press I4 key PF1 will show I4 Press PF key to exit pF Press PF key 7 Energy measurement Press ENERGY ke...

Страница 24: ...info tursdaletechnicalservices co uk 24 5 6 Only One Current I4 Measurement Application Measurement any wire current independent of voltage the same as clamp meter application...

Страница 25: ...ear memory data Please refer to software manual CD ROM use PC to clear memories data the meter can not clear memories data free from lost memories data 2 Store Auto datalogging data to memory Setting...

Страница 26: ...m wn HOLD ke auto power of de is enabled e n is active function is ac ent er W mode the meter ad to the U1 t lead to the ead to the U3 the electrical ng the voltage equipment s igator to the p t allig...

Страница 27: ...isconnect all test leads and current probe from any power electrical source press key to turn off the meter and remove the test leads from the jacks 3 The battery cover is secured to the bottom case b...

Отзывы: