Manual
12
7.3
Power on the instrument
Method 1: Press ► to turn on the instrument.
Method 2: Push the loading tube toward tester slowly until locking the impact body inside the probe. Then
let the loading tube back to original position. The instrument will be powered on.
The screen will display the measuring window after it is switched on, you can start measurement. At this
moment, all parameters will be performed by factory default (new tester) or by last settings before closed.
7.4
Power off the instrument
Method 1: Press and hold ► for several seconds till the instrument is powered off.
Method 2: The instrument will automatically shut down after about 2 minutes without operation.
Содержание PCE-2500
Страница 11: ...Manual 11 7 2 Diagram of operation...
Страница 27: ...BETRIEBSANLEITUNG 7 Bedienschema Englisch...
Страница 28: ...BETRIEBSANLEITUNG 8 Bedienschema Deutsch...